Uncertainties in the estimation of Mmax

被引:0
|
作者
Girish C. Joshi
Mukat Lal Sharma
机构
[1] Indian Institute of Technology Roorkee,
来源
关键词
Epistemic; aleatory; uncertainties; hazard assessment; maximum magnitude;
D O I
暂无
中图分类号
学科分类号
摘要
In the present paper, the parameters affecting the uncertainties on the estimation of Mmax have been investigated by exploring different methodologies being used in the analysis of seismicity catalogue and estimation of seismicity parameters. A critical issue to be addressed before any scientific analysis is to assess the quality, consistency, and homogeneity of the data. The empirical relationships between different magnitude scales have been used for conversions for homogenization of seismicity catalogues to be used for further seismic hazard assessment studies. An endeavour has been made to quantify the uncertainties due to magnitude conversions and the seismic hazard parameters are then estimated using different methods to consider the epistemic uncertainty in the process. The study area chosen is around Delhi. The b value and the magnitude of completeness for the four seismogenic sources considered around Delhi varied more than 40% using the three catalogues compiled based on different magnitude conversion relationships. The effect of the uncertainties has been then shown on the estimation of Mmax and the probabilities of occurrence of different magnitudes. It has been emphasized to consider the uncertainties and their quantification to carry out seismic hazard assessment and in turn the seismic microzonation.
引用
收藏
页码:671 / 682
页数:11
相关论文
共 50 条
  • [31] Uncertainties in the Sunspot Numbers: Estimation and Implications
    Thierry Dudok de Wit
    Laure Lefèvre
    Frédéric Clette
    Solar Physics, 2016, 291 : 2709 - 2731
  • [32] Estimation of basic uncertainties in clinical analysis
    Ozlem Sogut Ertas
    Aycil Kayali
    European Journal of Drug Metabolism and Pharmacokinetics, 2002, 27 : 75 - 78
  • [33] Estimation and control with bounded data uncertainties
    Linear Algebra Its Appl, 1-3 (259-306):
  • [34] INTERVAL EVALUATION OF THE EARTHQUAKE MAGNITUDE, MMAX
    GITIS, VG
    MIRONOV, MA
    BUNE, VI
    KALENIK, VN
    SHCHUKIN, YK
    IZVESTIYA AKADEMII NAUK SSSR FIZIKA ZEMLI, 1986, (04): : 24 - 31
  • [35] Estimation of design basis earthquake using region-specific Mmax, for the NPP site at Kalpakkam, Tamil Nadu, India
    Anbazhagan, P.
    Smitha, C., V
    Kumar, Abhishek
    Chandran, Deepu
    NUCLEAR ENGINEERING AND DESIGN, 2013, 259 : 41 - 64
  • [36] Uncertainties estimation in surveying measurands: application to volumes
    Covian, E.
    Puente, V
    Casero, M.
    Suarez, P. Cienfuegos
    MEASUREMENT SCIENCE AND TECHNOLOGY, 2024, 35 (04)
  • [37] Corporate Disclosures of the Major Sources of Estimation Uncertainties
    Mayorga, Diane M.
    Sidhu, Baljit K.
    AUSTRALIAN ACCOUNTING REVIEW, 2012, 22 (01) : 25 - 39
  • [38] Lane Boundary and Curb Estimation with Lateral Uncertainties
    Huang, Albert S.
    Teller, Seth
    2009 IEEE-RSJ INTERNATIONAL CONFERENCE ON INTELLIGENT ROBOTS AND SYSTEMS, 2009, : 1729 - 1734
  • [39] SUBOPTIMAL ESTIMATION OF SYSTEMS WITH LARGE PARAMETER UNCERTAINTIES
    LEONDES, CT
    PEARSON, JO
    AUTOMATICA, 1974, 10 (04) : 413 - 424
  • [40] Distributed Estimation on Sensor Networks With Measurement Uncertainties
    Knotek, Stefan
    Hengster-Movric, Kristian
    Sebek, Michael
    IEEE TRANSACTIONS ON CONTROL SYSTEMS TECHNOLOGY, 2021, 29 (05) : 1997 - 2011