Experimental Study on the Deformation of a Cut-Off Wall in a Landfill

被引:0
|
作者
Guozhong Dai
Jia Zhu
Yang Song
Shujin Li
Guicai Shi
机构
[1] Changzhou Institute of Technology,School of Civil Engineering & Architecture
[2] Changzhou Institute of Technology,Changzhou Key Lab of Structure Engineering and Material Properties
来源
关键词
Cut-off wall; Orthogonal experiment; Impermeability; Numerical analysis; Mechanical properties;
D O I
暂无
中图分类号
学科分类号
摘要
To effectively solve the leakage problem of landfill leachate, it is necessary to establish a vertical cut-off wall around the landfill site for seepage control. To accurately analyze the deformation of the cut-off wall, a 1/8-scale landfill cut-off wall miniature model is designed and fabricated. The actual force of the cut-off wall is simulated by filling sand on the outer side of the model wall. Meanwhile, a nonlinear finite element model of the wall is established using the ANSYS to simulate the deformation of the seepage wall. The results show that the cut-off wall made from a polyvinyl alcohol-bentonite-fly ash-cement (PBFC) anti-seepage slurry has a high ultimate bearing capacity, and its ultimate strain is approximately 5%, which is much higher than the limit strain of the actual force conditions of the cut-off wall. The horizontal displacement of the cut-off wall is approximately linear and decreases gradually from the top to the bottom, and no reverse displacement is observed. The main stress of the wall is smaller than that of the slurry, and there is no tensile stress. The simulated results are similar to the measured values of the cut-off wall, which indicates the accuracy of the simulation analysis.
引用
收藏
页码:1439 / 1447
页数:8
相关论文
共 50 条
  • [41] Automation of surface irrigation by cut-off time or cut-off distance control
    United States Bureau of Reclamation, Yuma Area Office, 7301 Calle Agua Salada, Yuma, AZ 85364, United States
    不详
    不详
    Appl Eng Agric, 2008, 5 (611-614):
  • [42] Experimental Study of the Process of Deformation of Elements That Are Being Cut Off.
    Zhukovets, A.P.
    Problemy Prochnosti, 1985, (03): : 115 - 119
  • [43] The compatibility of bentonite/sepiolite plastic concrete cut-off wall material
    Abbaslou, Hakime
    Ghanizadeh, Ali Reza
    Amlashi, Amir Tavana
    CONSTRUCTION AND BUILDING MATERIALS, 2016, 124 : 1165 - 1173
  • [44] Analytical solution for transport of degradable contaminant in cut-off wall and aquifer
    Chen, Zhang-Long
    Feng, Shi-Jin
    Chen, Hong-Xin
    Peng, Ming-Qing
    Li, Yi-Cheng
    Zhu, Zhang-Wen
    ENVIRONMENTAL GEOTECHNICS, 2023, 10 (01): : 44 - 56
  • [45] The chemical compatibility of cement-bentonite cut-off wall material
    Garvin, SL
    Hayles, CS
    CONSTRUCTION AND BUILDING MATERIALS, 1999, 13 (06) : 329 - 341
  • [46] Influence of a subsurface cut-off wall on nitrate contamination in an unconfined aquifer
    Sun, Qiguo
    Zheng, Tianyuan
    Zheng, Xilai
    Chang, Qinpeng
    Walther, Marc
    JOURNAL OF HYDROLOGY, 2019, 575 : 234 - 243
  • [47] An analytical model for contaminant transport in cut-off wall and aquifer system
    Xie, Haijian
    Wang, Shaoyi
    Chen, Yun
    Jiang, Jianqun
    Qiu, Zhanhong
    ENVIRONMENTAL GEOTECHNICS, 2020, 7 (07) : 457 - 466
  • [48] Performance of water cut-off and remediation promotion techniques at coastal waste landfill sites
    Inazumi, Shinya
    Kakuda, Toshimitsu
    JOURNAL OF MATERIAL CYCLES AND WASTE MANAGEMENT, 2014, 16 (03) : 533 - 545
  • [49] Stress calculation and analysis of cut-off wall in the sand gravel foundation
    Dong, Xin-mei
    Wei, Zhao-zhen
    Niu, Jing-tao
    He, Wen-long
    GREEN BUILDING, ENVIRONMENT, ENERGY AND CIVIL ENGINEERING, 2017, : 151 - 154
  • [50] Performance of water cut-off and remediation promotion techniques at coastal waste landfill sites
    Shinya Inazumi
    Toshimitsu Kakuda
    Journal of Material Cycles and Waste Management, 2014, 16 : 533 - 545