Microseismic Monitoring and Experimental Study on Mechanism of Delayed Rockburst in Deep-Buried Tunnels

被引:0
|
作者
Shichao Zhang
Tianhui Ma
Chun’an Tang
Peng Jia
Yucheng Wang
机构
[1] Northeastern University,School of Resources and Civil Engineering
[2] Dalian University of Technology,State Key Laboratory of Coastal and Offshore Engineering
来源
关键词
Stress adjustment; Rockburst formation; Precursor characteristics; Time behavior; Constant load; Failure mechanism;
D O I
暂无
中图分类号
学科分类号
摘要
Delayed rockburst occurs after the stress adjustment of surrounding rocks with discontinuous microseismicity, which is difficult to predict accurately. To predict and prevent the occurrence of the delayed rockbursts, study on time behavior of the surrounding rock failure and the mechanism behind the delayed rockbursts is necessary. In this article, based on the rockburst data from Jinping II Hydropower Station headrace tunnels, China, the characteristics of the delayed rockbursts are summarized. Considering the microseismic monitoring results of two typical delayed rockbursts, the formation process of delayed rockbursts is analyzed. Subsequently, the time behavior of rock failure is revealed by a uniaxial constant loading test. The results from our study suggest the surrounding rocks are in a relatively stable state, where the delayed rockburst occurs. Geo-stress, geological conditions and excavation are the key factors affecting the delayed rockbursts. Within the rockburst-affected area, the microseismic activities were frequent during the early stage of excavation, then the stress adjustment of the surrounding rocks gradually stabilized. As a result, the surrounding rocks were in a dormant stage, under the long-term high stress. Supported by laboratory experiments, our results suggest an obvious time behavior in the rock failure which corresponds to the time behavior of the crack propagation, under the high stress. Under the condition of long-term high stress, when the damage is accumulated to a certain extent, the rock mass is destabilized and then the rockburst is triggered, accordingly. The results from this study can provide a reference for the prediction and prevention of the delayed rockbursts, in similar situations, e.g. deep-buried tunnels, around the world.
引用
收藏
页码:2771 / 2788
页数:17
相关论文
共 50 条
  • [41] Intelligent tunnelling robot system for deep-buried long tunnels
    Zhang, Qinglong
    Zhu, Yanwen
    Ma, Rui
    Du, Sanlin
    Shao, Kun
    Jing, Liujie
    Zhang, Yongsheng
    Li, Qingbin
    FRONTIERS IN EARTH SCIENCE, 2023, 11
  • [42] Numerical simulation of seepage in deep-buried long and big tunnels
    School of Civil Engineering and Architecture, Beijing Jiaotong University, Beijing 100044, China
    不详
    不详
    Yanshilixue Yu Gongcheng Xuebao, 2006, 3 (511-519): : 511 - 519
  • [43] Geostress characteristic and simulation experiment of rockburst of a deep-buried tunnel in gaoligong mountain
    Zhang, Yongshuang
    Xiong, Tanyu
    Du, Yuben
    Li, Dejian
    Guo, Qiliang
    Deng, Hongke
    Zhang, Chunshan
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2009, 28 (11): : 2286 - 2294
  • [44] Microseismic monitoring and experimental study on rockburst in water-rich area of tunnel
    Tang, Shibin
    Li, Jiaming
    Tang, Liexian
    Zhang, Leitao
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2023, 141
  • [45] Real-time microseismic monitoring and its characteristic analysis during TBM tunneling in deep-buried tunnel
    Chen, Bingrui
    Feng, Xiating
    Zeng, Xionghui
    Xiao, Yaxun
    Zhang, Zhaotai
    Ming, Huajun
    Feng, Guangliang
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2011, 30 (02): : 275 - 283
  • [46] Research on Stress Characteristics of Rockburst in Over-Length Deep-Buried Tunnel
    Luo, Chun
    Zhang, Shishu
    Tang, Bihua
    Chen, Jun
    Yin, Chonglin
    Li, Huayun
    BUILDINGS, 2024, 14 (08)
  • [47] Evaluation of Rock Vibration Generated in Blasting Excavation of Deep-buried Tunnels
    Yang, Jianhua
    Lu, Wenbo
    Li, Peng
    Yan, Peng
    KSCE JOURNAL OF CIVIL ENGINEERING, 2018, 22 (07) : 2593 - 2608
  • [48] Influences of aquiclude on external water pressures on linings of deep-buried tunnels
    Xie X.-S.
    Xie X.-H.
    Wang X.-D.
    Lu B.
    Wang M.
    Chen H.-S.
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2020, 42 : 146 - 150
  • [49] Evaluation of Rock Vibration Generated in Blasting Excavation of Deep-buried Tunnels
    Jianhua Yang
    Wenbo Lu
    Peng Li
    Peng Yan
    KSCE Journal of Civil Engineering, 2018, 22 : 2593 - 2608
  • [50] Method for calculating deformation pressure of surrounding rock of deep-buried tunnels
    Wang M.-N.
    Wang Z.-L.
    Zhang X.
    Zhao S.-G.
    Liu D.-G.
    Tong J.-J.
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2020, 42 (01): : 81 - 90