Coordinating supply chain response-time: a bi-level programming approach

被引:0
|
作者
W. Yang
L. Li
S. Ma
机构
[1] Nanjing University of Science & Technology,Department of Management Science & Engneering, School of Economics & Management
[2] Nanjing University of Science & Technology,Department of Information Management, School of Economics & Management
[3] Huazhong University of Science & Technology,Department of Logistics & Operation Management, School of Management
关键词
Bi-level programming; Coordinating; Response-time; Supply chain management;
D O I
暂无
中图分类号
学科分类号
摘要
Agile response ability has become an essential competitive factor for firms in supply chain to survive in a rapidly changed market environment characterized by globalization and customization, especially for those distributing in the China Pearl river delta regions. Shortening and optimizing response time is an effective approach to reduce response-time of product launch. Treating the response-time in supply chain as an allocable resource, this paper presents an effective approach of coordinating the supply chain plan by allocating response-time among the node firms and assigning production time and logistics time rationally to each node firm. Given the core firm as a coordinating center, we construct a coordinated planning mechanism based on supply chain’s global benefit and node firm’s local benefit, and develop a bi-level programming approach to model supply chain response time. Finally, the model is tested and verified by analyzing a practical case which demonstrated that it is an effective decision-making aided tool for coordinating supply chain response-time.
引用
收藏
页码:1034 / 1043
页数:9
相关论文
共 50 条
  • [21] Pricing and advertising decisions in a dominant-retailer supply chain: A multi-follower bi-level programming approach
    Mokhlesian, M.
    Zegordi, S. H.
    SCIENTIA IRANICA, 2018, 25 (04) : 2254 - 2266
  • [22] Time-Cost Trade-off Problem in Construction Supply Chain: A Bi-level Programming Decision Model
    Chen Jian-hua
    Tang Wan
    2010 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING (ICMSE), 2010, : 212 - 217
  • [23] A Bi-level Programming Decision Model for Time-Cost Trade-off Problem in Construction Supply Chain
    Chen, Si-yun
    Shen, Si-min
    Chen, Jian-hua
    ICOSCM 2009 - PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON OPERATIONS AND SUPPLY CHAIN MANAGEMENT, 2009, 3 : 354 - 359
  • [24] A Solution to Interval Linear Bi-level Programming and Its Application in Decentralized Supply Chain Planning
    Wang, Jianzhong
    Du, Gang
    IEEE/SOLI'2008: PROCEEDINGS OF 2008 IEEE INTERNATIONAL CONFERENCE ON SERVICE OPERATIONS AND LOGISTICS, AND INFORMATICS, VOLS 1 AND 2, 2008, : 2035 - 2038
  • [25] A probabilistic bi-level linear multi-objective programming problem to supply chain planning
    Roghanian, E.
    Sadjadi, S. J.
    Aryanezhad, M. B.
    APPLIED MATHEMATICS AND COMPUTATION, 2007, 188 (01) : 786 - 800
  • [26] Study on the Bi-level Programming Model for Closed Loop Supply Chain under Competitive Environment
    Yang Yu-xiang
    Zhou Zu-man
    Zhou Gen-gui
    PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON LOGISTICS SYSTEMS AND INTELLIGENT MANAGEMENT, VOLS 1-3, 2010, : 20 - 24
  • [27] Coordinating a bi-level blood supply chain with interactions between supply-side and demand-side operational decisions
    Moshtagh, Mohammad S.
    Zhou, Yun
    Verma, Manish
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2024,
  • [28] Fuzzy approach for Bi-level programming problems(II)
    Pei, Zheng
    Huang, Tianmin
    2000, Sci Publ House (35):
  • [29] Fuzzy approach for Bi-level programming problems(II)
    Pei, Zheng
    Huang, Tianmin
    Xinan Jiaotong Daxue Xuebao/Journal of Southwest Jiaotong University, 2000, 35 (01): : 98 - 101
  • [30] A Bi-level programming approach to design a sustainable supply chain network under uncertainty: a real-life case study
    Fishani, Behzad Aghaei
    Mahmoodirad, Ali
    Niroomand, Sadegh
    Hajiaghaei-Keshteli, Mostafa
    CLEAN TECHNOLOGIES AND ENVIRONMENTAL POLICY, 2024,