Treatment of coke-plant wastewater at Bhilai Steel Plant

被引:1
|
作者
Sabirova T.M. [1 ]
Ryazantseva N.A. [2 ]
机构
[1] Yeltsin Ural Federal University, Chemical Technology Institute, Yekaterinburg
[2] AO VUKhIN, Yekaterinburg
来源
Sabirova, T.M. (sabirovatm@gmail.com) | 1600年 / Allerton Press Incorporation卷 / 60期
关键词
aeration tank; biochemical treatment; coke-plant wastewater; final purification; integrated biotechnology; nitrification and denitrification; nitrogen removal; reactor;
D O I
10.3103/S1068364X17080051
中图分类号
学科分类号
摘要
The existing biochemical system in the coke plant at Bhilai Steel Plant is inspected and assessed, with a view to introducing nitrification and denitrification, without reconstruction. It is shown that the existing biochemical-treatment facility will accommodate a nitrification and denitrification system capable of processing coke at a rate of 3.0–3.5 million t/yr. With reconstruction of the aeration system, the throughput may be increased to 4.8 million t/yr. That entails continuous dosing of alkaline reagent in the treated water. Recommendations are made for improved operation of the biochemical system. © 2017, Allerton Press, Inc.
引用
收藏
页码:326 / 331