Optimizing non-unit repetitive project resource and scheduling by evolutionary algorithms

被引:0
|
作者
Duc-Hoc Tran
Jui-Sheng Chou
Duc-Long Luong
机构
[1] Ho Chi Minh City University of Technology,Department of Construction Engineering and Management
[2] Vietnam National University Ho Chi Minh,Department of Civil and Construction Engineering
[3] City (VNU-HCM),undefined
[4] National Taiwan University of Science and Technology,undefined
来源
Operational Research | 2022年 / 22卷
关键词
Scheduling; Management; Repetitive project; Artificial bee colony; Fuzzy clustering;
D O I
暂无
中图分类号
学科分类号
摘要
Repetitive project scheduling is a frequently encountered and challenging task in project planning. Researchers have developed numerous methods for the scheduling and planning of repetitive construction projects. However, almost all current repetitive scheduling methods are based on identical production units or they neglect the priorities of activities. This work presents a new hybrid evolutionary approach, called the fuzzy clustering artificial bee colony approach (FABC), to optimize resource assignment and scheduling for non-unit repetitive projects (NRP). In FABC, the fuzzy c-means clustering technique applies several multi-parent crossover operators to utilize population information efficiently and to improve convergence efficiency. The scheduling subsystem considers the following: (1) the logical relationships among activities throughout the project; (2) the assignment of multiple resources; and (3) the priorities of activities in groups to calculate project duration. Two numerical case studies are analyzed to demonstrate the use of the FABC-NRP model and its ability to optimize the scheduling of non-unit repetitive construction projects. Experimental results indicate that the proposed method yields the shortest project duration on average and deviation of optimal solution among benchmark algorithms considered herein and those considered previously. The outcomes will help project managers to prepare better schedules of repetitive projects.
引用
收藏
页码:77 / 103
页数:26
相关论文
共 50 条
  • [31] Optimizing for a Resource-constrained Multi-project Scheduling Problem with Planned Resource Unavailability
    Tian, Jinwen
    Dong, Xingye
    Han, Sheng
    PROCEEDINGS OF THE 2018 3RD INTERNATIONAL CONFERENCE ON MODELLING, SIMULATION AND APPLIED MATHEMATICS (MSAM 2018), 2018, 160 : 243 - 248
  • [32] A Tool for Comparing Resource-Constrained Project Scheduling Problem Algorithms
    Olteanu, Alexandru-Liviu
    AIC '09: PROCEEDINGS OF THE 9TH WSEAS INTERNATIONAL CONFERENCE ON APPLIED INFORMATICS AND COMMUNICATIONS: RECENT ADVANCES IN APPLIED INFORMAT AND COMMUNICATIONS, 2009, : 182 - +
  • [33] Problem space search algorithms for resource-constrained project scheduling
    Kedar S. Naphade
    S. David Wu
    Robert H. Storer
    Annals of Operations Research, 1997, 70 : 307 - 326
  • [34] On the performance of bee algorithms for resource-constrained project scheduling problem
    Ziarati, Koorush
    Akbari, Reza
    Zeighami, Vahid
    APPLIED SOFT COMPUTING, 2011, 11 (04) : 3720 - 3733
  • [35] Problem space search algorithms for resource-constrained project scheduling
    Naphade, KS
    Wu, SD
    Storer, RH
    ANNALS OF OPERATIONS RESEARCH, 1997, 70 (0) : 307 - 326
  • [36] A novel multiple objective whale optimization for time-cost-quality tradeoff in non-unit repetitive projects
    Nguyen, Dang-Trinh
    Doan, Dinh-Thien-Vuong
    Tran, Nguyen-Ngoc Cuong
    Tran, Duc-Hoc
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2023, 23 (05) : 843 - 854
  • [37] Non-unit-based planning and scheduling of repetitive construction projects
    Huang, Rong-Yau
    Sun, Kuo-Shun
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2006, 132 (06) : 585 - 597
  • [38] Optimizing project selection and scheduling problems with time-dependent resource constraints
    Liu, Shu-Shun
    Wang, Chang-Jung
    AUTOMATION IN CONSTRUCTION, 2011, 20 (08) : 1110 - 1119
  • [39] Optimizing Resource-Constrained Project Scheduling Problem considering the Reliability Function
    Naderi, Saeideh
    VaezGhasemi, Mohsen
    Movahedi Sobhani, Farzad
    DISCRETE DYNAMICS IN NATURE AND SOCIETY, 2022, 2022
  • [40] The Multimode Resource-Constrained Project Scheduling Problem for Repetitive Activities in Construction Projects
    Garcia-Nieves, J. D.
    Ponz-Tienda, J. L.
    Salcedo-Bernal, A.
    Pellicer, E.
    COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2018, 33 (08) : 655 - 671