Optimizing non-unit repetitive project resource and scheduling by evolutionary algorithms

被引:0
|
作者
Duc-Hoc Tran
Jui-Sheng Chou
Duc-Long Luong
机构
[1] Ho Chi Minh City University of Technology,Department of Construction Engineering and Management
[2] Vietnam National University Ho Chi Minh,Department of Civil and Construction Engineering
[3] City (VNU-HCM),undefined
[4] National Taiwan University of Science and Technology,undefined
来源
Operational Research | 2022年 / 22卷
关键词
Scheduling; Management; Repetitive project; Artificial bee colony; Fuzzy clustering;
D O I
暂无
中图分类号
学科分类号
摘要
Repetitive project scheduling is a frequently encountered and challenging task in project planning. Researchers have developed numerous methods for the scheduling and planning of repetitive construction projects. However, almost all current repetitive scheduling methods are based on identical production units or they neglect the priorities of activities. This work presents a new hybrid evolutionary approach, called the fuzzy clustering artificial bee colony approach (FABC), to optimize resource assignment and scheduling for non-unit repetitive projects (NRP). In FABC, the fuzzy c-means clustering technique applies several multi-parent crossover operators to utilize population information efficiently and to improve convergence efficiency. The scheduling subsystem considers the following: (1) the logical relationships among activities throughout the project; (2) the assignment of multiple resources; and (3) the priorities of activities in groups to calculate project duration. Two numerical case studies are analyzed to demonstrate the use of the FABC-NRP model and its ability to optimize the scheduling of non-unit repetitive construction projects. Experimental results indicate that the proposed method yields the shortest project duration on average and deviation of optimal solution among benchmark algorithms considered herein and those considered previously. The outcomes will help project managers to prepare better schedules of repetitive projects.
引用
收藏
页码:77 / 103
页数:26
相关论文
共 50 条
  • [1] Optimizing non-unit repetitive project resource and scheduling by evolutionary algorithms
    Tran, Duc-Hoc
    Chou, Jui-Sheng
    Luong, Duc-Long
    OPERATIONAL RESEARCH, 2022, 22 (01) : 77 - 103
  • [2] A non-unit repetitive construction project scheduling with uncertainties
    Long, Luong Duc
    AUTOMATION IN CONSTRUCTION, 2024, 164
  • [3] System development for non-unit based repetitive project scheduling
    Huang, R
    Sun, KS
    AUTOMATION IN CONSTRUCTION, 2005, 14 (05) : 650 - 665
  • [4] Scheduling Non-Unit Jobs to Minimize Calibrations
    Fineman, Jeremy T.
    Sheridan, Brendan
    SPAA'15: PROCEEDINGS OF THE 27TH ACM SYMPOSIUM ON PARALLELISM IN ALGORITHMS AND ARCHITECTURES, 2015, : 161 - 170
  • [5] A comparison of non-unit and unit protection algorithms for HVDC grids
    Perez-Molina, Maria Jose
    Marene Larruskain, Dunixe
    Eguia Lopez, Pablo
    Abarrategi, Oihane
    Santos-Mugica, Maider
    2019 AEIT HVDC INTERNATIONAL CONFERENCE (AEIT HVDC): OPERATIONAL EXPERIENCE AND TECHNOLOGICAL DEVELOPMENT FOR APPLICATION WORLDWIDE, 2019,
  • [6] Task Scheduling Algorithm for Non-unit Time Testing
    Yang Zhongming
    Li Wei
    Zeng Wenquan
    2019 INTERNATIONAL CONFERENCE ON IMAGE AND VIDEO PROCESSING, AND ARTIFICIAL INTELLIGENCE, 2019, 11321
  • [7] Resource continuity constraints in repetitive project scheduling
    Wang, W. (xiaoxin301@126.com), 2013, Binary Information Press, Flat F 8th Floor, Block 3, Tanner Garden, 18 Tanner Road, Hong Kong (10):
  • [8] Accelerate Non-unit Stride Convolutions with Winograd Algorithms
    Pan, Junhao
    Chen, Deming
    2021 26TH ASIA AND SOUTH PACIFIC DESIGN AUTOMATION CONFERENCE (ASP-DAC), 2021, : 358 - 364
  • [9] Optimizing the Roles of Unit and Non-unit Protection Methods Within DC Microgrids
    Fletcher, Steven
    Norman, Patrick
    Galloway, Stuart
    Burt, Graeme
    2013 IEEE POWER AND ENERGY SOCIETY GENERAL MEETING (PES), 2013,