To the calculation of pillar stability under condition of chamber mining

被引:0
|
作者
A. A. Baryakh
N. A. Samodelkina
机构
[1] Russian Academy of Sciences,Mining Institute, Ural Branch
来源
Journal of Mining Science | 2007年 / 43卷
关键词
Pillars; mathematical modeling; loading rate; stress tensor invariants;
D O I
暂无
中图分类号
学科分类号
摘要
It is established by mathematical modeling that the loading rate of an interchamber pillar agrees with the maximal relative shear stress intensity reached over each vertical section of the pillar. This correlation is used to find the corrective coefficient for the loading rate of pillars in the inclined strata and for the intermediate pillars in the stopes.
引用
收藏
页码:8 / 16
页数:8
相关论文
共 50 条
  • [41] Stability of Coal Pillar and Roof Movement Characteristics in Roadway Backfill Mining
    Lin, Hai
    Yang, Renshu
    Li, Yongliang
    Fang, Shizheng
    ADVANCES IN CIVIL ENGINEERING, 2021, 2021
  • [42] Parameter design method of supporting coal pillar for end-slope mining under non-uniform load condition
    Jiang, Juyu
    Zhang, Yulong
    Cao, Lanzhu
    Wang, Dong
    Wang, Laigui
    Li, Guanghe
    Hou, Chengheng
    Meitan Kexue Jishu/Coal Science and Technology (Peking), 2024, 52 (12): : 23 - 37
  • [43] STABILITY OF LONGWALL MINING GATE ROADWAYS IN RELATION TO RIB PILLAR SIZE
    WHITTAKER, BN
    SINGH, RN
    INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 1981, 18 (04): : 331 - 334
  • [44] Study on the Mechanism of Progressive Instability of Special-Shaped Coal Pillar and the Stability Control of Roadway Under the Influence of Mining
    Chen, Dingchao
    Wang, Xiangyu
    Zhang, Feiteng
    Bai, Jianbiao
    Zhao, Xiangqian
    Li, Menglong
    Yu, Yang
    Wang, Xiangdong
    Sun, Shiqi
    ROCK MECHANICS AND ROCK ENGINEERING, 2024, 57 (08) : 6461 - 6483
  • [45] Stability of coal pillars in room-and-pillar goaf with opposite mining under ultra-close shallow goafs
    Huang Q.
    Wang L.
    Du J.
    He Y.
    Yang Z.
    Liu Z.
    Shen H.
    Yue Y.
    Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2022, 39 (01): : 118 - 125
  • [46] MODELING OF BEARING MASSIF CONDITION DURING CHAMBER MINING OF ORE DEPOSITS
    Khomenko, O.
    Kononenko, M.
    Danylchenko, M.
    MINING OF MINERAL DEPOSITS, 2016, 10 (02): : 40 - 47
  • [47] Selection and optimization for mining structural parameters of shallow hole chamber and pillar succedent filling method
    Tan, Zhuoying
    Zhong, Wen
    Qi, Kuan
    Ren, Honggang
    Electronic Journal of Geotechnical Engineering, 2013, 18 Q : 3573 - 3580
  • [48] Coal pillar destabilization prediction and mining method in residual mining areas under remining disturbances
    Wen, Guang
    Gong, Peilin
    Zhu, Yanhui
    Yi, Kang
    Li, Peng
    Kang, Hui
    Tian, Ye
    ENERGY SCIENCE & ENGINEERING, 2024, 12 (03) : 492 - 507
  • [49] Experience in block-pillar mining under rock burst conditions
    Kozyrev, AA
    Maltsev, VA
    Rybin, VV
    Svinin, VS
    MASSMIN 2000, PROCEEDINGS, 2000, 2000 (07): : 805 - 810
  • [50] Visco-elasto-plastic simulations for coal pillar stability affected by mining
    Tan, Y. L.
    Sun, C. J.
    Wu, Z. K.
    Chen, Y. J.
    BOUNDARIES OF ROCK MECHANICS: RECENT ADVANCES AND CHALLENGES FOR THE 21ST CENTURY, 2008, : 383 - 387