To the calculation of pillar stability under condition of chamber mining

被引:0
|
作者
A. A. Baryakh
N. A. Samodelkina
机构
[1] Russian Academy of Sciences,Mining Institute, Ural Branch
来源
Journal of Mining Science | 2007年 / 43卷
关键词
Pillars; mathematical modeling; loading rate; stress tensor invariants;
D O I
暂无
中图分类号
学科分类号
摘要
It is established by mathematical modeling that the loading rate of an interchamber pillar agrees with the maximal relative shear stress intensity reached over each vertical section of the pillar. This correlation is used to find the corrective coefficient for the loading rate of pillars in the inclined strata and for the intermediate pillars in the stopes.
引用
收藏
页码:8 / 16
页数:8
相关论文
共 50 条
  • [1] To the calculation of pillar stability under condition of chamber mining
    Baryakh, A. A.
    Samodelkina, N. A.
    JOURNAL OF MINING SCIENCE, 2007, 43 (01) : 8 - 16
  • [2] DEFORMATION CHARACTERISTICS OF A TECHNOLOGICAL PILLAR IN THE CHAMBER-PILLAR MINING SYSTEM
    Grzebyk, Wieslaw
    Stolecki, Lech
    ARCHIVES OF MINING SCIENCES, 2014, 59 (02) : 323 - 335
  • [3] Simulation Research for the Influence of Mining Sequence on Coal Pillar Stability under Highwall Mining Method
    Huang, Jing
    Meng, Fanbao
    Wang, Ge
    Wu, Yingkui
    Wen, Jinhao
    GEOFLUIDS, 2021, 2021
  • [4] Calculation of subsidiary mining stress in floor roadway under the remaining boundary pillar of close coal seam mining
    Yue X.
    Tu M.
    Li Y.
    Zhang J.
    Gao L.
    Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2021, 38 (02): : 246 - 252and259
  • [5] Study on surface movement and deformation characteristics and pillar stability of large strip mining under deep mining
    Chen Juntao
    Sheng Kaikai
    Yin Limin
    Wu Chuanqiang
    RESOURCES AND SUSTAINABLE DEVELOPMENT, PTS 1-4, 2013, 734-737 : 531 - +
  • [6] Modeling Uncertainties in Mining Pillar Stability Analysis
    Cauvin, Maxime
    Verdel, Thierry
    Salmon, Romuald
    RISK ANALYSIS, 2009, 29 (10) : 1371 - 1380
  • [7] Some Considerations Concerning Pillar Load and Pillar Stability in Post-Pillar Mining Systems
    Blaha, Hannes
    Wagner, Horst
    BHM Berg- und Huttenmannische Monatshefte, 2013, 158 (04): : 121 - 129
  • [8] Stability analysis on pillar for point-pillar mining of karst water mine
    Fu, Shi-Gen
    Xu, Kai-Li
    PROGRESS IN MINE SAFETY SCIENCE AND ENGINEERING II, 2014, : 1145 - 1149
  • [9] Influence mechanism of pillar-side backfilling on the overburden-coal pillar system's stability under upward mining
    Ma, Junbiao
    Bai, Jinwen
    Cui, Boqiang
    Feng, Guorui
    Wang, Shanyong
    Shi, Xudong
    Pan, Ruikai
    Xun, Jianliang
    Fan, Zhiqiang
    MATERIALS TODAY COMMUNICATIONS, 2025, 44
  • [10] Aerodynamic calculation method of engine stability under actual inlet condition
    Xie Y.
    Liu Y.
    Pan B.
    Hangkong Dongli Xuebao/Journal of Aerospace Power, 2019, 34 (04): : 804 - 812