Using discrete simulation for a mine mill

被引:0
|
作者
Sturgul, JR [1 ]
Goetze, M [1 ]
Ritter, F [1 ]
机构
[1] Univ Idaho, Dept Min & Met, Moscow, ID 83843 USA
关键词
D O I
暂无
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
A simulation model of the materials flow through a mine mill can have important practical applications. Unlike a materials balance model that tends to balance the output to the input of the mill, a discrete system simulation model follows the progression of a single unit of material through the various stages of the mill. A unit of ore passing through the system can be considered as a discrete element It should be possible to model the mill using discrete system simulation techniques. This was done for a generic, working mill using the GPSS/H(tm) language and PROOF Professional(tm) animation. The model assumed that the mill feed was assumed to be in so many units/minute. This rate was taken to be a variable which could change during the simulation. The milling rates could also be sped up or slowed down. This example shows that it is possible to use a language such as GPSS/H to model continuous flow in a mill. The basic flow of material was from a single crusher through a set of crushing devices (either ball, rod or autogenous could be used here), into the floatation cells, to the driers and into various stockpiles. The whole program was written in modular form so that it can be eventually incorporated into a larger program which includes the mining of the ore. The animation model used shows the working of the mill in "cartoon" fashion.
引用
收藏
页码:811 / 814
页数:4
相关论文
共 50 条
  • [21] 3D DISCRETE ELEMENT METHOD SIMULATION TO VARIOUS TYPES OF MILL
    Kwon, Jihoe
    Lee, Hoon
    Cho, Heechan
    GEOSYSTEM ENGINEERING, 2008, 11 (01) : 19 - 24
  • [22] Analysis of mill performance of industrial scale ball mill using DEM simulation
    Li, Hongcheng
    Dong, Weimin
    Xie, Xingping
    ADVANCES IN CHEMICAL, MATERIAL AND METALLURGICAL ENGINEERING, PTS 1-5, 2013, 634-638 : 3732 - 3736
  • [23] LOGISTIC EVALUATION OF AN UNDERGROUND MINE USING SIMULATION
    Fioroni, Marcelo Moretti
    Alves dos Santos, Leticia Cristina
    Franzese, Luiz Augusto G.
    Santana, Isac Reis
    Telles, Gustavo Dezem
    Seixas, Josiane Cordeiro
    Penna, Bruno
    de Alkmim, Gerson Mendes
    PROCEEDINGS OF THE 2014 WINTER SIMULATION CONFERENCE (WSC), 2014, : 1855 - 1865
  • [24] Localization using discrete event simulation
    Aksoy, B
    Ustun, V
    Smith, JS
    PROCEEDINGS OF THE 2004 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, 2004, : 989 - 993
  • [25] A linkage of truck-and-shovel operations to short-term mine plans using discrete-event simulation
    Torkamani, Elmira
    Askari-Nasab, Hooman
    International Journal of Mining and Mineral Engineering, 2015, 6 (02) : 97 - 118
  • [26] USING ADA FOR DISCRETE EVENT SIMULATION
    BRUNO, G
    SOFTWARE-PRACTICE & EXPERIENCE, 1984, 14 (07): : 685 - 695
  • [27] DISCRETE EVENT SIMULATION USING OCCAM
    NEVISON, C
    APPLYING TRANSPUTER BASED PARALLEL MACHINES ( OUG 10 ), 1989, : 222 - 230
  • [28] Mill and roller mill of the Bogoslowsk. Mine AG in Ural
    Stark, F
    ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1902, 46 : 1976 - 1979
  • [29] Mine-to-mill technique increases mine, plant productivity
    不详
    MINING ENGINEERING, 2001, 53 (12) : 14 - 14
  • [30] Mine Mill fights back: Mine mill/CAW Local 598 strike 2000-2001
    不详
    LABOUR-LE TRAVAIL, 2007, (59): : 323 - 323