Numerical Simulations of Construction of Shield Tunnel with Small Clearance to Adjacent Tunnel without and with Isolation Pile Reinforcement

被引:49
|
作者
Lv, Jianbing [1 ]
Li, Xulong [1 ]
Li, Zhanrong [2 ]
Fu, Helin [3 ]
机构
[1] Guangdong Univ Technol, Coll Civil & Transportat Engn, Guangzhou 510000, Guangdong, Peoples R China
[2] China Tunnel Construct Co Ltd, Guangzhou 510000, Guangdong, Peoples R China
[3] Cent S Univ, Sch Civil Engn, Changsha 410012, Hunan, Peoples R China
基金
中国国家自然科学基金;
关键词
Small spacing; Shield construction; Bored pile reinforcement; Numerical simulation; Settlement; Deformation monitoring; DISTANCE;
D O I
10.1007/s12205-020-1167-y
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In the process of building subways in many cities, the technology of shield tunneling has become more widely used. In large cities, it is inevitable for the tunnels to pass through the foundations of buildings or between deep piles of bridges. Due to the many restrictions on urban space in China, the clearance between two tunnels has also become smaller. Hence, it is an urgent technical problem to resolve the mutual influence of the close construction of two tunnels using shield technology. In this study, the shield construction project of two tunnels with a small clearance of 2.6 m has been analyzed. The project is between Tongdewei Station and Shangbu Station in the northern extension section of the Guangzhou Metro Line 8. The main parameters used in the analyses are the tunnel lining deformation and the ground settlement. The construction without and with the isolation pile reinforcement have been simulated numerically. The simulation results have been compared with the on-site monitoring data. Based on the comparison, it shows that with the reinforcement, the tunnel lining deformation and the ground settlement can be reduced significantly. The effect of subway shield construction on the construction of the first subway tunnel will significantly reduce. The deformation of the shield excavation net width and the mutual influence can also be greatly reduced. The findings from this study can be used as technical foundation and reference for the construction of similar projects, i.e. shield tunnel construction with a small clearance between tunnels.
引用
收藏
页码:295 / 309
页数:15
相关论文
共 50 条
  • [31] Risk assessment of shield construction adjacent to the existing shield tunnel based on improved nonlinear FAHP
    Guo, Desai
    Meng, Fanyan
    Wu, Huaina
    Yang, Xinxin
    Chen, Renpeng
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2025, 155
  • [32] Impact of pit supporting SMW pile construction on underneath shield tunnel deformation
    Wang Z.-S.
    Pan H.-S.
    Zhuang Q.-H.
    Liu J.-G.
    Chen X.-M.
    Tong L.-Y.
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2019, 41 : 53 - 56
  • [33] Influence of shield tunnel construction on short pile foundation-frame structure
    Key Laboratory of Road and Traffic Engineering of the Ministry of Education, Tongji University, Shanghai 200331, China
    Zhongguo Tiedao Kexue, 2009, 4 (51-57): : 51 - 57
  • [34] Numerical simulation of underground excavated tunnel construction of adjacent structure
    Department of Civil Engineering, Zhejiang University City College, Hangzhou 310015, China
    不详
    Rock Soil Mech, 1600, 2 (547-552):
  • [35] Numerical Analysis on Influence of Underground Space Construction on Adjacent Tunnel
    Gong, Jianwu
    Wang, Xin
    Sheng, Hao
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON ADVANCES IN ENERGY, ENVIRONMENT AND CHEMICAL ENGINEERING, 2015, 23 : 592 - 595
  • [36] Numerical analysis of the influence of underpinning pile affected by overlapping tunnel with shield method
    Ou, Ping
    Yuan, Hong
    Hu, Shifeng
    Yang, Xiongfei
    PROCEEDINGS OF THE 2017 2ND INTERNATIONAL CONFERENCE ON ADVANCES IN MATERIALS, MECHATRONICS AND CIVIL ENGINEERING (ICAMMCE 2017), 2017, 121 : 108 - 113
  • [37] Study and analysis of internal force induced by shield tunnel construction of adjacent structure
    Ding, Zhi
    Wei, Xin-Jiang
    Wei, Gang
    Li, Xiao-Zhen
    Yantu Lixue/Rock and Soil Mechanics, 2011, 32 (SUPPL. 1): : 749 - 754
  • [38] Analysis and Discussion on Surface Settlement induced by Shield Tunnel Construction of Adjacent Sructure
    Ding Zhi
    Wei Xin-Jiang
    Zhang Tao
    Ge Guo-Bao
    DISASTER ADVANCES, 2012, 5 (04): : 341 - 345
  • [39] Impact of Double-O-Tube Shield Tunnel Construction on Adjacent Buildings
    Wei Xinjiang
    Hong Jie
    Wei Gang
    DISASTER ADVANCES, 2012, 5 (04): : 1744 - 1748
  • [40] Analysis of the displacement caused by shield-driven construction adjacent to the existing tunnel
    Zhu, Lei
    Huang, Hongwei
    Zhao, Jingyan
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING, PTS. 1-5, 2012, 204-208 : 1413 - 1418