Optimisation of production and subcontracting strategies

被引:4
|
作者
Sinha, Ashesh Kumar [1 ]
Davich, Thomas [1 ]
Krishnamurthy, Ananth [1 ]
机构
[1] Univ Wisconsin, Dept Ind & Syst Engn, Madison, WI USA
关键词
custom engineered products; iterative approach; mathematical programming models; stochastic lead times; queuing network models; subcontracting; SYSTEMS; ALLOCATION; FACILITY; NETWORKS; OPTION;
D O I
10.1080/00207543.2015.1077285
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We consider the problem of optimising production and subcontracting decisions in a supply chain manufacturing engineered products. The supply chain manager can use a combination of internal production capacities, available capacity at qualified subcontractors, make capital investments and process improvements to minimise costs associated with production and penalties for not meeting desired operational metrics. We formulate this as an optimisation problem that requires simultaneous solution of a mathematical programming problem and queuing network model. We propose an efficient iterative approach to solve this problem and conduct numerical studies to demonstrate the effectiveness of the approach.
引用
收藏
页码:2377 / 2393
页数:17
相关论文
共 50 条