共 50 条
- [21] INGENUITY AND ABN HELP WIN A MAJOR-CONTRACT INDUSTRIAL DIAMOND REVIEW, 1983, 43 (06): : 297 - 297
- [22] SUB-CONTRACTOR SOLVES THE PROBLEM OF MANUFACTURING AN OPTICAL MEASURING INSTRUMENT BY USING PRECISION-MADE PLASTIC PARTS. IPE International, Industrial & Production Engineering, 1985, 9 (01): : 37 - 38
- [23] Contract analysis and contractor auditing PHARMAZEUTISCHE INDUSTRIE, 1997, 59 (11): : 995 - 997
- [25] SELECTING THE CONTRACT AND THE CONTRACTOR - THE CONTRACTORS VIEWPOINT INDUSTRIAL AND ENGINEERING CHEMISTRY, 1955, 47 (08): : A35 - A36
- [26] Contract win for Clayton Walker INTERNATIONAL GAS ENGINEERING AND MANAGEMENT, 2005, 45 (08): : 30 - 30
- [28] FROM VISION TO SUPERVISION - SELECTING THE CONTRACT AND THE CONTRACTOR INDUSTRIAL AND ENGINEERING CHEMISTRY, 1955, 47 (07): : A19 - A20
- [30] The study of the non-contract restriction of the contractor Proceedings of 20th IPMA World Congress on Project Management, Vols 1 and 2, 2006, : 165 - 167