Uncertainty in the extreme flood magnitude estimates of large-scale flood hazard models

被引:17
|
作者
Devitt, Laura [1 ]
Neal, Jeffrey [1 ,3 ]
Wagener, Thorsten [2 ,3 ,4 ]
Coxon, Gemma [1 ,3 ]
机构
[1] Univ Bristol, Sch Geog Sci, Bristol, Avon, England
[2] Univ Bristol, Dept Civil Engn, Bristol, Avon, England
[3] Univ Bristol, Cabot Inst, Bristol, Avon, England
[4] Univ Potsdam, Inst Environm Sci & Geog, Potsdam, Germany
来源
ENVIRONMENTAL RESEARCH LETTERS | 2021年 / 16卷 / 06期
基金
英国工程与自然科学研究理事会;
关键词
large-scale flood hazard models; global hydrological model; flood risk; GLOBAL HYDROLOGICAL MODELS; STREAMFLOW; REGIONALIZATION; RUNOFF; IMPACT; STATE; WIDTH;
D O I
10.1088/1748-9326/abfac4
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The growing worldwide impact of flood events has motivated the development and application of global flood hazard models (GFHMs). These models have become useful tools for flood risk assessment and management, especially in regions where little local hazard information is available. One of the key uncertainties associated with GFHMs is the estimation of extreme flood magnitudes to generate flood hazard maps. In this study, the 1-in-100 year flood (Q100) magnitude was estimated using flow outputs from four global hydrological models (GHMs) and two global flood frequency analysis datasets for 1350 gauges across the conterminous US. The annual maximum flows of the observed and modelled timeseries of streamflow were bootstrapped to evaluate the sensitivity of the underlying data to extrapolation. Results show that there are clear spatial patterns of bias associated with each method. GHMs show a general tendency to overpredict Western US gauges and underpredict Eastern US gauges. The GloFAS and HYPE models underpredict Q100 by more than 25% in 68% and 52% of gauges, respectively. The PCR-GLOBWB and CaMa-Flood models overestimate Q100 by more than 25% at 60% and 65% of gauges in West and Central US, respectively. The global frequency analysis datasets have spatial variabilities that differ from the GHMs. We found that river basin area and topographic elevation explain some of the spatial variability in predictive performance found in this study. However, there is no single model or method that performs best everywhere, and therefore we recommend a weighted ensemble of predictions of extreme flood magnitudes should be used for large-scale flood hazard assessment.
引用
收藏
页数:15
相关论文
共 50 条
  • [21] Advances in Large-Scale Flood Monitoring and Detection
    Manfreda, Salvatore
    Samela, Caterina
    Refice, Alberto
    Tramutoli, Valerio
    Nardi, Fernando
    HYDROLOGY, 2018, 5 (03):
  • [22] Large-scale flood modeling and forecasting with FloodCast
    Xu, Qingsong
    Shi, Yilei
    Bamber, Jonathan L.
    Ouyang, Chaojun
    Zhu, Xiao Xiang
    WATER RESEARCH, 2024, 264
  • [23] PLANNING AND IMPLEMENTING A LARGE-SCALE POLYMER FLOOD
    WEISS, WW
    BALDWIN, RW
    JOURNAL OF PETROLEUM TECHNOLOGY, 1985, 37 (04): : 720 - 730
  • [24] Large-Scale Flood Hazard Monitoring and Impact Assessment on Landscape: Representative Case Study in India
    Halder, Bijay
    Barman, Subhadip
    Banik, Papiya
    Das, Puja
    Bandyopadhyay, Jatisankar
    Tangang, Fredolin
    Shahid, Shamsuddin
    Pande, Chaitanya B.
    Al-Ramadan, Baqer
    Yaseen, Zaher Mundher
    SUSTAINABILITY, 2023, 15 (14)
  • [25] Large-Scale Two-Dimensional Cascade Modeling of the Odra River for Flood Hazard Management
    Banasiak, Robert
    WATER, 2024, 16 (01)
  • [26] Comparison of estimates of global flood models for flood hazard and exposed gross domestic product: a China case study
    Aerts, Jerom P. M.
    Uhlemann-Elmer, Steffi
    Eilander, Dirk
    Ward, Philip J.
    NATURAL HAZARDS AND EARTH SYSTEM SCIENCES, 2020, 20 (12) : 3245 - 3260
  • [27] Surface water connectivity dynamics of a large scale extreme flood
    Trigg, Mark A.
    Michaelides, Katerina
    Neal, Jeffrey C.
    Bates, Paul D.
    JOURNAL OF HYDROLOGY, 2013, 505 : 138 - 149
  • [28] Operational flood management under large-scale extreme conditions, using the example of the Middle Elbe
    Kron, A.
    Nestmann, F.
    Schlueter, I.
    Schaedler, G.
    Kottmeier, C.
    Helms, M.
    Mikovec, R.
    Ihringer, J.
    Musall, M.
    Oberle, P.
    Saucke, U.
    Bieberstein, A.
    Danhelka, J.
    Krejci, J.
    NATURAL HAZARDS AND EARTH SYSTEM SCIENCES, 2010, 10 (06) : 1171 - 1181
  • [29] Assessment of extreme flood hazard in the Wateringues plain
    Lepelletier, Thierry
    Lemoigne, E.
    Henique, J.
    Clerc, F.
    Parent, Ph
    Cusenier, Ph
    HOUILLE BLANCHE-REVUE INTERNATIONALE DE L EAU, 2014, (04): : 20 - 25
  • [30] Flood Risk Assessment for Large-scale Dike Systems
    Cheng Wei-shuai
    Ji Chang-ming
    Liu Dan
    NEW PERSPECTIVES ON RISK ANALYSIS AND CRISIS RESPONSE, 2009, : 413 - +