Evaluating the Insurance Corporation of British Columbia road-safety improvement program

被引:22
|
作者
Sayed, T
deLeur, P
Sawalha, Z
机构
[1] Univ British Columbia, Dept Civil Engn, Vancouver, BC V6T 1Z4, Canada
[2] Insurance Corp British Columbia, Vancouver, BC V6Z 2X4, Canada
[3] Bradley Univ, Dept Civil Engn & Construct, Coll Engn & Technol, Peoria, IL 61625 USA
关键词
D O I
10.3141/1865-09
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The Insurance Corporation of British Columbia (ICBC) has been involved in the investment of road infrastructure improvement for many years, delivering an annual program known as the Road Improvement Program. Corporation staff realized that selective road improvement projects have tremendous potential to improve road safety performance. This improved road safety performance, measured in terms of a reduction in the frequency and severity of collisions, also led to a reduction in the cost of automobile insurance claims. This reduced claim cost provided the basis for the economic justification for investments in road infrastructure improvements. To ensure that the justification for the ICBC investment in road safety improvements is verified, a formal evaluation of the Road Improvement Program is undertaken at regular intervals. However, conducting a thorough and reliable evaluation of road safety projects can be difficult and involves significant effort. Presented are details of the important factors that should be considered when conducting an evaluation of road safety improvement projects. The methodology and results used to perform the latest ICBC program evaluation are described.
引用
收藏
页码:57 / 63
页数:7
相关论文
共 24 条
  • [21] Evaluating the safety of intragastric balloon: An analysis of the Metabolic and Bariatric Surgery Accreditation and Quality Improvement Program
    Dang, Jerry T.
    Switzer, Noah J.
    Sun, Warren Y. L.
    Raghavji, Faizal
    Birch, Daniel W.
    Karmali, Shahzeer
    SURGERY FOR OBESITY AND RELATED DISEASES, 2018, 14 (09) : 1340 - 1347
  • [22] Benchmarking of Oil and Gas Pipeline Companies in British Columbia: Integrating Integrity Management Program and Safety Culture Using a Risk-Based Approach
    Iqbal, Hassan
    Haider, Husnain
    Waheed, Bushra
    Tesfamariam, Solomon
    Sadiq, Rehan
    ENGINEERING MANAGEMENT JOURNAL, 2022, 34 (04) : 526 - 542
  • [23] Evaluating the effectiveness of the Safety Improvement Program in Saskatchewan using an observational before-after study with the full Bayes approach
    Sacchi, Emanuele
    Tayebikhorami, Saeid
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2021, 48 (12) : 1706 - 1712
  • [24] Did implementation of no-fault auto-insurance in British Columbia, Canada, impact return to work following road trauma? Protocol for a before-after survival analysis
    Chan, Herbert
    Erdelyi, Shannon
    Jiang, Alex
    McLeod, Christopher
    Koehoorn, Mieke
    Brubacher, Jeffrey R.
    BMJ OPEN, 2023, 13 (09):