Comparative study of meta-heuristics for solving flow shop scheduling problem under fuzziness

被引:0
|
作者
Gonzalez, Noelia [1 ]
Vela, Camino R. [1 ]
Gonzalez-Rodriguez, Ines [1 ]
机构
[1] Univ Oviedo, Ctr Inteligencia Artificial, Campus Viesques, E-33271 Gijon, Spain
来源
BIO-INSPIRED MODELING OF COGNITIVE TASKS, PT 1, PROCEEDINGS | 2007年 / 4527卷
关键词
fuzzy sets; flow shop scheduling; meta-heuristics; evolutive algorithms;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
In this paper we propose a hybrid method, combining heuristics and local search, to solve flow shop scheduling problems under uncertainty. This method is compared with a genetic algorithm from the literature, enhanced with three new multi-objective functions. Both single objective and multi-objective approaches are taken for two optimisation goals: minimisation of completion time and fulfilment of due date constraints. We present results for newly generated examples that illustrate the effectiveness of each method.
引用
收藏
页码:548 / +
页数:3
相关论文
共 50 条
  • [41] Bio-inspired population-based meta-heuristics for problem solving
    Jos Manuel Ferrández
    Ramiro Varela
    Natural Computing, 2017, 16 : 187 - 188
  • [42] Comparison of three meta heuristics to optimize hybrid flow shop scheduling problem with parallel machines
    Syam, Wahyudin P.
    Al-Harkan, Ibrahim M.
    World Academy of Science, Engineering and Technology, 2010, 38 : 919 - 926
  • [43] Meta-heuristics for the single-machine scheduling total weighted tardiness problem
    Madureira, Ana Maria
    Proceedings of the IEEE International Symposium on Assembly and Task Planning, 1999, : 405 - 410
  • [44] Hybrid meta-heuristics for the unrelated parallel machine scheduling problem with setup times
    Fang, Wei
    Zhu, Haolin
    Mei, Yi
    KNOWLEDGE-BASED SYSTEMS, 2022, 241
  • [45] Bio-inspired population-based meta-heuristics for problem solving
    Manuel Ferrandez, Jos
    Varela, Ramiro
    NATURAL COMPUTING, 2017, 16 (02) : 187 - 188
  • [46] Meta-heuristics for manufacturing scheduling and logistics problems
    Liao, Ching-Jong
    Gen, Mitsuo
    Tiwari, Manoj Kumar
    Chang, Pei-Chann
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 141 (01) : 1 - 3
  • [47] An Ensemble of Meta-Heuristics for the Energy-Efficient Blocking Flowshop Scheduling Problem
    Kizilay, Damla
    Tasgetiren, M. Fatih
    Pan, Quan-Ke
    Suer, Gursel
    25TH INTERNATIONAL CONFERENCE ON PRODUCTION RESEARCH MANUFACTURING INNOVATION: CYBER PHYSICAL MANUFACTURING, 2019, 39 : 1177 - 1184
  • [48] A survey on meta-heuristics for solving disassembly line balancing, planning and scheduling problems in remanufacturing
    Gao, K. Z.
    He, Z. M.
    Huang, Y.
    Duan, P. Y.
    Suganthan, P. N.
    SWARM AND EVOLUTIONARY COMPUTATION, 2020, 57
  • [49] Comparison of two Meta-Heuristics for the Bi-Objective Flexible Job Shop Scheduling Problem with Sequence Dependent Setup Times
    Sacramento, Joao
    Pedrosa, Joao
    Chibeles-Martins, Nelson
    Pinto-Varela, Tania
    30TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, PTS A-C, 2020, 48 : 181 - 186
  • [50] Solving Traffic Signal Scheduling Problems in Heterogeneous Traffic Network by Using Meta-Heuristics
    Gao, Kaizhou
    Zhang, Yicheng
    Su, Rong
    Yang, Fajun
    Suganthan, Ponnuthurai Nagaratnam
    Zhou, MengChu
    IEEE TRANSACTIONS ON INTELLIGENT TRANSPORTATION SYSTEMS, 2019, 20 (09) : 3272 - 3282