Feasibility study on the installation of a lifting pipe by the tow method

被引:0
|
作者
Jang, YS [1 ]
机构
[1] Hyundai Heavy Ind Co Ltd, Hyundai Maritime Res Inst, Ulsan, South Korea
关键词
lifting pipe; mining; installation; operation; tow; upend;
D O I
暂无
中图分类号
U6 [水路运输]; P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
A conventional lifting pipe for deep sea mining is usually very long and consists of many short pipe pieces. In order to connect these pieces, each piece must have a special connecting mechanism and this part is vulnerable to fatigue damage during long operation period. Moreover it takes quite a long time to deploy and retrieve these pieces at operation fields. To improve these structural and operational drawbacks, the pipe tow method may be applied. Among many tow methods, the most feasible method is selected and its applicability is confirmed using analytical solutions for static tow conditions. Together with the well established tow procedure, an efficient procedure for installing and operating a lifting pipe and a miner is studied to reduce down-time.
引用
收藏
页码:64 / 67
页数:4
相关论文
共 50 条
  • [21] INSTALLATION OF FIBERGLASS PIPE - CLOSURE
    SCHROCK, BJ
    TRANSPORTATION ENGINEERING JOURNAL OF ASCE, 1980, 106 (03): : 367 - 367
  • [22] Feasibility study of electromagnetic driven dream pipe
    Furukawa, Masao
    Morishita, Mimpei
    Yokoyama, Shuichi
    INTERNATIONAL JOURNAL OF HEAT AND MASS TRANSFER, 2015, 83 : 212 - 221
  • [23] A systematic approach to pipe-in-pipe installation analysis
    Jiwa, M. Z.
    Kim, D. K.
    Mustaffa, Z.
    Choi, H. S.
    OCEAN ENGINEERING, 2017, 142 : 478 - 490
  • [24] Feasibility study of installation photovoltaic system at a university in Indonesia: A case study
    Umar, H.
    Amudy, M.
    Rizal, T. A.
    4TH ANNUAL APPLIED SCIENCE AND ENGINEERING CONFERENCE, 2019, 2019, 1402
  • [25] The Lifting Installation of Manganese Nodules and Pump Test
    Yang, Ning
    Tang, Dasheng
    Yang, Ling
    PROCEEDINGS OF THE EIGHTH (2008) ISOPE PACIFIC/ASIA OFFSHORE MECHANICS SYMPOSIUM: PACOMS-2008, 2008, : 30 - 35
  • [26] The influence of the reeling installation method on the integrity of circumferential welds in Tight Fit Pipe
    Focke, ES
    van Oosten, J
    Meek, J
    Romeijn, A
    Nakasugi, H
    PROCEEDINGS OF THE FIFTEENTH (2005) INTERNATIONAL OFFSHORE AND POLAR ENGINEERING CONFERENCE, VOL 2, 2005, : 31 - 37
  • [27] Jacking Force Analysis of Pipe Installation Using a Modified Guided Boring Method
    Yi, Yaolin
    Khondoker, Md. Tareq Hossain
    Bayat, Alireza
    Ranjbar, Mahmood
    JOURNAL OF PIPELINE SYSTEMS ENGINEERING AND PRACTICE, 2017, 8 (04)
  • [28] On a method of using the tow net as an opening and closing tow net
    Murray, G
    NATURE, 1905, 71 : 364 - 365
  • [29] Feasibility Study of Microgrid Installation in an Educational Institution with Grid Uncertainty
    Sahoo, Ashwin Kumar
    Abhitharan, K. P.
    Kalaivani, A.
    Karthik, T. J.
    PROCEEDINGS OF THE 4TH INTERNATIONAL CONFERENCE ON ECO-FRIENDLY COMPUTING AND COMMUNICATION SYSTEMS, 2015, 70 : 550 - 557
  • [30] FEASIBILITY STUDY FOR A LARGE THERMAL STORAGE AND HEAT PUMPING INSTALLATION
    WILSON, MR
    APPLIED ENERGY, 1980, 6 (03) : 159 - 169