Rail Mounted Gantry Crane Scheduling In Rail-Truck Transshipment Terminal

被引:7
|
作者
Wang, Li [1 ]
Zhu, Xiaoning [1 ]
Xie, Zhengyu [1 ]
机构
[1] Beijing Jiaotong Univ, Sch Traff & Transportat, Beijing, Peoples R China
来源
基金
中国国家自然科学基金;
关键词
Intermodal transportation; Genetic algorithm; Dual cycle scheduling; Rail mounted gantry crane; Rail-truck transshipment terminal; PORT CONTAINER TERMINALS; ALGORITHM; YARDS;
D O I
10.1080/10798587.2015.1041764
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Rail mounted gantry crane (RMGC) scheduling is vital to handling efficiency in rail-truck transshipment terminals. In this paper, we propose an optimization model for RMGC scheduling problem based on a dual cycle mode. A genetic algorithm is designed to obtain the optimization handling sequence. Computational experiments on a specific rail-truck transshipment terminal show that the proposed method is effective to solve RMGC scheduling problems in rail-truck transshipment terminals.
引用
收藏
页码:61 / 73
页数:13
相关论文
共 50 条