Scheduling;
Rejection penalty;
Polynomial time approximation scheme;
Fully polynomial time approximation scheme;
RELEASE DATES;
ALGORITHMS;
MINIMIZE;
D O I:
暂无
中图分类号:
TP301 [理论、方法];
学科分类号:
081202 ;
摘要:
Given m identical machines and n independent jobs, each job J(j) has a processing time (or size) p(j) and a penalty e(j). A job can be either rejected, in which case its penalty is paid, or scheduled on one of the machines, in which case its processing time contributes to the load of that machine. The objective is to minimize the makespan of the schedule for accepted jobs under the constraint that the total penalty of the rejected jobs is no more than a given bound B. In this paper, we present a 2-approximation algorithm within strongly polynomial time and a polynomial time approximation scheme whose running time is O(nm O(1/e(2)) + mn(2)) for the general case. Moreover, we present a fully polynomial time approximation scheme for the case where the number of machines is a fixed constant. This result improves previous best running time from O(n(m+2) /epsilon(m)) to O(1/epsilon(2m+3) + mn(2)).
机构:
Hong Kong Univ Sci & Technol, Dept Ind Engn & Logist Management, Hong Kong, Hong Kong, Peoples R ChinaHong Kong Univ Sci & Technol, Dept Ind Engn & Logist Management, Hong Kong, Hong Kong, Peoples R China
Lee, Chung-Yee
Yu, Gang
论文数: 0引用数: 0
h-index: 0
机构:
Dell Inc, Round Rock, TX 78682 USAHong Kong Univ Sci & Technol, Dept Ind Engn & Logist Management, Hong Kong, Hong Kong, Peoples R China