共 50 条
- [42] Modular forms for the A1-tower ABHANDLUNGEN AUS DEM MATHEMATISCHEN SEMINAR DER UNIVERSITAT HAMBURG, 2018, 88 (02): : 297 - 316
- [46] Optimal lift scheduling in modular warehouse systems Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2023, 43 (11): : 3307 - 3319
- [47] Distillation breakthrough reduces tower height HYDROCARBON PROCESSING, 2002, 81 (10): : 29 - 29
- [48] MODULAR LIGHT TOWER DOUBLES AS GENERATOR SET DIESEL PROGRESS ENGINES & DRIVES, 1994, 60 (06): : 8 - 8
- [50] COMPUTERIZED PM REDUCES UNSCHEDULED EQUIPMENT DOWNTIME AT DEUTZ-ALLIS. Practical lubrication & maintenance, 1987, 10 (04): : 27 - 28