Modelling and scheduling of an asynchronous cyclic production line with multiple parts

被引:0
|
作者
Tan, B [1 ]
Karabati, S [1 ]
机构
[1] Koc Univ, Grad Sch Business, Istanbul, Turkey
关键词
cyclic scheduling; stochastic scheduling; asynchronous production lines; Markov chain; manufacturing systems;
D O I
暂无
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this study, we model and analyse a production line with asynchronous part transfers, processing time variability, and cyclic scheduling in the same framework. We consider a production line with multiple parts and finite interstation buffers. The line produces a batch of n jobs repetitively using the same order of jobs in every batch. The processing time of a job on a station is a random variable and is assumed to have a phase-type distribution. Parts are transferred between the stations in an asynchronous manner. We first present a continuous time Markov chain model to analyse the performance of this system for a given sequence. A state-space representation of the model and the associated rate matrix are generated automatically. The steady state probabilities of the Markov chain are determined by using a recursive method that exploits the special structure of the rate matrix. The cycle time, the production rate, and the expected Work-In-Progress (WIP) inventory are used as the main performance measures. We then present an approximate procedure to determine the cyclic sequence that minimises the cycle time. We then investigate the effects of operating decisions, system structure, processing time variability, and their interaction in the same framework. Numerical results for the performance evaluation and scheduling of cyclic production lines are also presented.
引用
收藏
页码:1296 / 1308
页数:13
相关论文
共 50 条
  • [31] Moving policies in cyclic assembly-line scheduling
    Müller-Hannemann, M
    Weihe, K
    PARAMETERIZED AND EXACT COMPUTATION, PROCEEDINGS, 2004, 3162 : 149 - 161
  • [32] Optimization and Application of Flexible Production Line Production Scheduling
    Liu, Yefeng
    Zhao, Yuan
    Li, Kangju
    Yu, Shengping
    PROCEEDINGS OF THE 39TH CHINESE CONTROL CONFERENCE, 2020, : 1472 - 1476
  • [33] An efficient solution to cyclic scheduling of a no-wait reentrant serial-parallel PCB production line
    Che A-da
    Chu Cheng-bin
    PROCEEDINGS OF 2007 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (14TH) VOLS 1-3, 2007, : 746 - 751
  • [34] Manpower allocation in an asynchronous production line with leveled labor
    Wu, K. Y.
    Lai, H. F.
    Ho, C. Y.
    2007 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-4, 2007, : 1158 - +
  • [35] Modelling and heuristics of FMS scheduling with multiple objectives
    Low, C
    Yip, Y
    Wu, TH
    COMPUTERS & OPERATIONS RESEARCH, 2006, 33 (03) : 674 - 694
  • [36] Semi-Fixed-Priority Scheduling with Multiple Mandatory Parts
    Chishiro, Hiroyuki
    Yamasaki, Nobuyuki
    2013 IEEE 16TH INTERNATIONAL SYMPOSIUM ON OBJECT/COMPONENT/SERVICE-ORIENTED REAL-TIME DISTRIBUTED COMPUTING (ISORC), 2013,
  • [37] PRODUCTION SCHEDULING WITH MULTIPLE CRITERIA OBJECTIVES
    STAINTON, RS
    OPERATIONAL RESEARCH QUARTERLY, 1977, 28 (02) : 285 - 292
  • [38] Optimal cyclic scheduling for printed circuit board production lines with multiple hoists and general processing sequence
    Leung, J
    Zhang, GQ
    IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 2003, 19 (03): : 480 - 484
  • [39] Scheduling In-Line Multiple Cluster Tools
    Kim, Hyun-Jung
    Lee, Jun-Ho
    Baik, Sunhee
    Lee, Tae-Eog
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2015, 28 (02) : 171 - 179
  • [40] On-line deadline scheduling on multiple resources
    Kim, JH
    Chwa, KY
    COMPUTING AND COMBINATORICS, 2001, 2108 : 443 - 452