Assembly Line Balancing with Method Ranking Positional Weight (case study: XYZ Company)

被引:0
|
作者
Ginting, Rosnani [1 ]
William [1 ]
机构
[1] Univ Sumatera Utara, Fac Engn, Dept Ind Engn, Medan 20155, Indonesia
关键词
D O I
10.1088/1757-899X/1003/1/012032
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A company uses several methods to increase productivity in the company. One of method used in increasing productivity is balancing production lines on each work element. Balancing the work track can be done by allocated work elements. The allocation of work elements in the work station can be seen at cycle time. Big difference in cycle time causes some work elements have bottlenecks. In achieving high productivity in a work station company must have a balanced workload. Effectiveness in the production floor aims to make the company achieve the desired production target of consumers. Companies failing to achieve production targets will have a negative impact on the company. The negative impact felt by the company in the form of losses. Ineffectiveness in production summary can be caused by differences between machine capacity and production capacity. Machine capsules that are smaller than the capacity of production cause the work elements must have accumulated. Effective production trajectories can be measured by producing high output with low resource utilization. The reason why companies often experience bottlenecks on a production floor is an imbalance of resources within a factory.
引用
收藏
页数:5
相关论文
共 50 条
  • [41] ASSEMBLY LINE BALANCING BY USING STATISTICAL METHOD IN CLOTHING PRODUCTION
    Eryuruk, Selin Hanife
    Baskak, Murat
    Kalaoglu, Fatma
    TEKSTIL VE KONFEKSIYON, 2011, 21 (01): : 65 - 71
  • [42] An Exact Method for the Assembly Line Re-balancing Problem
    Makssoud, Fatme
    Battaia, Olga
    Dolgui, Alexandre
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: SUSTAINABLE PRODUCTION AND SERVICE SUPPLY CHAINS, PT 1, 2013, 414 : 159 - 166
  • [43] An exact method for cost-oriented assembly line balancing
    Amen, M
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2000, 64 (1-3) : 187 - 195
  • [45] A Case Study in Line Balancing and Simulation
    Yilmazlar, I. Ozan
    Jeyes, Adarsh
    Fiore, Alexis
    Patel, Apurva
    Spence, Chelsea
    Wentzky, Chase
    Zero, Nicole
    Kurz, Mary E.
    Summers, Joshua D.
    Taaffe, Kevin M.
    48TH SME NORTH AMERICAN MANUFACTURING RESEARCH CONFERENCE, NAMRC 48, 2020, 48 : 71 - 81
  • [46] Assembly line balancing: general resource-constrained case
    Corominas, Albert
    Ferrer, Laia
    Pastor, Rafael
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (12) : 3527 - 3542
  • [47] A LINE BALANCING HEURISTIC CASE-STUDY FOR EXISTING SURFACE-MOUNT ASSEMBLY-LINE SETUPS
    WATKINS, RE
    COCHRAN, JK
    COMPUTERS & INDUSTRIAL ENGINEERING, 1995, 29 : 681 - 685
  • [48] Balancing assembly lines: an industrial case study
    Lapierre, SD
    Ruiz, AB
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2004, 55 (06) : 589 - 597
  • [49] Balancing a mixed-model assembly line with unskilled temporary workers: algorithm and case study
    Kim, Dongwook
    Moon, Dug Hee
    Moon, Ilkyeong
    ASSEMBLY AUTOMATION, 2018, 38 (04) : 511 - 523
  • [50] Reconfiguration of assembly line balancing-an automobile case study solved by the exact solution procedure
    Yadav, Ashish
    Kumar, Shashank
    Agrawal, Sunil
    BENCHMARKING-AN INTERNATIONAL JOURNAL, 2021, 28 (05) : 1576 - 1604