Assembly Line Balancing with Method Ranking Positional Weight (case study: XYZ Company)

被引:0
|
作者
Ginting, Rosnani [1 ]
William [1 ]
机构
[1] Univ Sumatera Utara, Fac Engn, Dept Ind Engn, Medan 20155, Indonesia
关键词
D O I
10.1088/1757-899X/1003/1/012032
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A company uses several methods to increase productivity in the company. One of method used in increasing productivity is balancing production lines on each work element. Balancing the work track can be done by allocated work elements. The allocation of work elements in the work station can be seen at cycle time. Big difference in cycle time causes some work elements have bottlenecks. In achieving high productivity in a work station company must have a balanced workload. Effectiveness in the production floor aims to make the company achieve the desired production target of consumers. Companies failing to achieve production targets will have a negative impact on the company. The negative impact felt by the company in the form of losses. Ineffectiveness in production summary can be caused by differences between machine capacity and production capacity. Machine capsules that are smaller than the capacity of production cause the work elements must have accumulated. Effective production trajectories can be measured by producing high output with low resource utilization. The reason why companies often experience bottlenecks on a production floor is an imbalance of resources within a factory.
引用
收藏
页数:5
相关论文
共 50 条
  • [1] Assembly line balancing with positional constraints, task assignment restrictions and station paralleling: A case in an electronics company
    Tuncel, Gonca
    Topaloglu, Seyda
    COMPUTERS & INDUSTRIAL ENGINEERING, 2013, 64 (02) : 602 - 609
  • [2] ASSEMBLY LINE BALANCING - AN IMPROVEMENT OF RANKED POSITIONAL WEIGHT TECHNIQUE - A HEURISTIC METHOD OF ASSEMBLY LINE BALANCING FOR ASSUMPTIONS OF CONSTANT OR VARIABLE WORK ELEMENT TIMES
    HOFFMANN, TR
    MANSOOR, EM
    MOODIE, CL
    YOUNG, HH
    JOURNAL OF INDUSTRIAL ENGINEERING, 1965, 16 (05): : 346 - &
  • [3] Implementation of Ranked Positional Weight Method (RPWM) for Double-Sided Assembly Line Balancing Problems
    Hamzas, M. F. M. A.
    Bareduan, S. A.
    Zakaria, M. Z.
    Ghazali, S.
    Zairi, S.
    3RD ELECTRONIC AND GREEN MATERIALS INTERNATIONAL CONFERENCE 2017 (EGM 2017), 2017, 1885
  • [4] Analysis of productivity improvement using line balancing method (study case assembling line in PT XYZ)
    Iwan, R.
    INTERNATIONAL CONFERENCE ON DESIGN, ENGINEERING AND COMPUTER SCIENCES, 2018, 453
  • [5] Assembly line balancing in a clothing company
    Eryuruk, S. H.
    Kalaoglu, F.
    Baskak, M.
    FIBRES & TEXTILES IN EASTERN EUROPE, 2008, 16 (01) : 93 - 98
  • [6] Optimising and simulating the assembly line balancing problem in a motorcycle manufacturing company: a case study
    Cortes, Pablo
    Onieva, Luis
    Guadix, Jose
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (12) : 3637 - 3656
  • [7] Solution of the assembly line balancing problem using the rank positional weight method and Kilbridge and Wester heuristics method: An application in the cable industry
    Celik, Mirac Tuba
    Arslankaya, Seher
    JOURNAL OF ENGINEERING RESEARCH, 2023, 11 (03): : 182 - 191
  • [8] A METHOD FOR ASSEMBLY LINE BALANCING
    BETTS, J
    MAHMOUD, KI
    ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1989, 18 (01): : 55 - 64
  • [9] Assembly Line Worker Assignment and Balancing Problem with Positional Constraints
    Yang, Hyungjoon
    Lee, Je-Hun
    Kim, Hyun-Jung
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: ARTIFICIAL INTELLIGENCE FOR SUSTAINABLE AND RESILIENT PRODUCTION SYSTEMS, PT V, 2021, 634 : 3 - 11
  • [10] Balancing and Simulation of Assembly Line in an LCD Manufacturing Company
    Buyuksaatci, Sinem
    Tuysuz, Fatih
    Bilen, Kemal
    2015 6TH INTERNATIONAL CONFERENCE ON MODELING, SIMULATION, AND APPLIED OPTIMIZATION (ICMSAO), 2015,