Design and analysis of steel structures for back-up installations of tunnel boring machines

被引:0
|
作者
Baumann, Hans Joerg [1 ]
Bluemel, Steffen [1 ]
Kaelin, Andreas [2 ]
机构
[1] Bau Ing AG, CH-5312 Dottingen Ag, Switzerland
[2] Rowa Tunnelling Logist AG, CH-8855 Wangen Sz, Switzerland
关键词
3;
D O I
10.1002/stab.201410194
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Back-up installations of tunnel boring machines are generally made of steel structures. The analysis and structural design is analogous to the steel building constructions and has to be done on the basis of EN 1993 or equivalent national standards. However, for such temporary and moving structures a variety of specific design requirements due to use and various static requirements concerning loads and system modelling have to be taken into account. In this paper, some of these requirements as well as solutions for the design will be presented.
引用
收藏
页码:632 / 637
页数:6
相关论文
共 50 条
  • [31] Effective use of back analysis in tunnel design
    Asche, HR
    Day, RA
    Doherty, J
    Peglas, TW
    FRONTIERS OF ROCK MECHANICS AND SUSTAINABLE DEVELOPMENT IN THE 21ST CENTURY, 2001, : 565 - 568
  • [32] Design and Optimization of Tunnel Boring Machines by Simulating the Cutting Rock Process using the Discrete Element Method
    Medel-Morales, Roberto C.
    Botello-Rionda, Salvador
    COMPUTACION Y SISTEMAS, 2013, 17 (03): : 329 - 339
  • [33] Reliability Analysis of Full-Face Tunnel Boring Machines with the Monte Carlo Simulation Technique
    Mikaeil, Reza
    Khoshalan, Hasel Amini
    Nasrollahi, Mohammad Hossein
    Esmaeilzadeh, Akbar
    RUDARSKO-GEOLOSKO-NAFTNI ZBORNIK, 2022, 37 (03): : 149 - 160
  • [34] Research and Design on Power Distribution Terminal and Back-up Power Applicable to Extremely Cold Area
    Zhang Xilin
    Xia Yandong
    RENEWABLE ENERGY AND ENVIRONMENTAL TECHNOLOGY, PTS 1-6, 2014, 448-453 : 2389 - 2393
  • [35] Reliability Analysis of Different Configurations of Master and Back-Up Systems Used in Maritime Navigation
    Blokus, Agnieszka
    Dziula, Przemyslaw
    JOURNAL OF MARINE SCIENCE AND ENGINEERING, 2020, 8 (01)
  • [36] INLAND'S APPLICATION OF FORGED STEEL BACK-UP ROLLS FOR HOT AND COLD STRIP MILLS.
    Easter, H.C.
    I & SM, 1986, 13 (10): : 27 - 34
  • [37] Application of Virtual Sensors for Fault Detection and Back-up of Combustion Gas Analyzers in a Steel Plant Furnace
    Ko H.-C.
    Seok K.H.
    Lee J.H.
    Park J.H.
    Kim S.W.
    Journal of Institute of Control, Robotics and Systems, 2022, 28 (08): : 708 - 713
  • [38] Design of a capacitor energy storage based back-up switching supply for automation terminal units
    School of Communication and Information Engineering, Xi'an University of Science and Technology, Xi'an 710054, China
    Dianli Xitong Baohu yu Kongzhi, 2009, 22 (116-120):
  • [39] Design optimization and simplification of PEM fuel cell systems for back-up power applications.
    Balasubramanian, B
    Barbir, F
    Byron, R
    Nomikos, S
    Stone, M
    ABSTRACTS OF PAPERS OF THE AMERICAN CHEMICAL SOCIETY, 2002, 224 : U568 - U568
  • [40] Life Analysis of Industrial Gas Turbines Used As a Back-Up to Renewable Energy Sources
    Isaiah, Thank-God
    Dabbashi, Siddig
    Bosak, Dawid
    Sampath, Suresh
    Di Lorenzo, Giuseppina
    Pilidis, Pericles
    PROCEEDINGS OF THE 4TH INTERNATIONAL CONFERENCE ON THROUGH-LIFE ENGINEERING SERVICES, 2015, 38 : 239 - 244