共 50 条
- [35] A Two-stage Heuristic Method for Vulcanization Production Scheduling 2011 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-6, 2011, : 3601 - 3605
- [37] Lagrangian based approach to solve a two level capacitated lot sizing problem COGENT ENGINEERING, 2015, 2 (01):