Heuristic approaches to solve a two-stage lot sizing and scheduling problem

被引:6
|
作者
Pinho Schimidt, Talita Mariana [1 ]
Cassius Tadeu, Scarpin [1 ]
Valentim Loch, Gustavo [1 ]
Schenekemberg, Cleder Marcos [1 ]
机构
[1] Univ Fed Parana, Grp Tecnol Aplicado Otimizacao, Curitiba, Parana, Brazil
关键词
Lot sizing; IEEE transactions; Processor scheduling; Parallel machines; Acceleration; Mathematical model; Lot sizing and scheduling; Buffer between stages; Time lags; Decomposition heuristics; GENETIC ALGORITHM; FIX;
D O I
10.1109/TLA.2019.8863314
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper addresses the two-stage lot sizing and scheduling problem considering the production environment with parallel machines. The aim of this problem is to ensure the synchrony between the stages through of the integrated lot sizing and scheduling decisions. In addition, we consider the presence of a buffer between the production stages with minimum and maximum time lags of the items. Reprocessing, discarding and acceleration costs are considered when the permanence times of the items in the buffer are not respected. Two mathematical models and several heuristics strategies based on decomposition of the problem are presented to solve real data adapted instances. The results showed that our heuristic strategies can achieve competitive solutions in short computational time, outperforming the solutions provided by the optimization solver.
引用
收藏
页码:434 / 443
页数:10
相关论文
共 50 条
  • [1] A decomposition heuristic to solve the two-stage lot sizing and scheduling problem with temporal cleaning
    Toscano, Alyne
    Ferreira, Deisemara
    Morabito, Reinaldo
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2019, 31 (01) : 142 - 173
  • [2] A decomposition heuristic to solve the two-stage lot sizing and scheduling problem with temporal cleaning
    Alyne Toscano
    Deisemara Ferreira
    Reinaldo Morabito
    Flexible Services and Manufacturing Journal, 2019, 31 : 142 - 173
  • [3] Synchronized Two-Stage Lot Sizing and Scheduling Problem in Automotive Industry
    Uney-Yuksektepe, Fadime
    Ozdemir, Rifat Gurcan
    OPERATIONS RESEARCH PROCEEDINGS 2011, 2012, : 477 - 482
  • [4] The two-group heuristic to solve the multi-product, economic lot sizing and scheduling problem in flow shops
    Ouenniche, J
    Boctor, FF
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2001, 129 (03) : 539 - 554
  • [5] Inventory control in supply chains: Alternative approaches to a two-stage lot-sizing problem
    Kovacs, Andras
    Egri, Peter
    Kis, Tamas
    Vancza, Jozsef
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 143 (02) : 385 - 394
  • [6] A two-stage heuristic for single machine capacitated lot-sizing and scheduling with sequence-dependent setup costs
    Shim, Ik-Soo
    Kim, Hyeok-Chol
    Doh, Hyoung-Ho
    Lee, Dong-Ho
    COMPUTERS & INDUSTRIAL ENGINEERING, 2011, 61 (04) : 920 - 929
  • [7] Two-stage ACO to solve the job shop scheduling problem
    Puris, Amilkar
    Bello, Rafael
    Trujillo, Yaima
    Nowe, Ann
    Martinez, Yailen
    PROGRESS IN PATTERN RECOGNITION, IMAGE ANALYSIS AND APPLICATIONS, PROCEEDINGS, 2007, 4756 : 447 - 456
  • [8] A new two-stage heuristic for the recreational vehicle scheduling problem
    Kulkarni, Sarang
    Patil, Rahul
    Krishnamoorthy, Mohan
    Ernst, Andreas
    Ranade, Abhiram
    COMPUTERS & OPERATIONS RESEARCH, 2018, 91 : 59 - 78
  • [9] Two-stage stochastic lot-sizing problem under cost uncertainty
    Zhou, Zhili
    Guan, Yongpei
    ANNALS OF OPERATIONS RESEARCH, 2013, 209 (01) : 207 - 230
  • [10] Algorithms for the two-stage production-capacitated lot-sizing problem
    Hark-Chin Hwang
    Hyun-Soo Ahn
    Philip Kaminsky
    Journal of Global Optimization, 2016, 65 : 777 - 799