A Critical Review of Visual Aid Implementation in Lean Construction Scheduling Process

被引:0
|
作者
Pratama, Lucky Agung [1 ]
Dossick, Carrie Sturts [2 ]
机构
[1] Univ Washington, Coll Built Environm, Seattle, WA 98195 USA
[2] Univ Washington, Coll Built Environm, Dept Construct Management, Seattle, WA 98195 USA
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
One of the recent advances in the construction industry is the virtualization/digital representation of information. Building information modeling (BIM), which has been adopted over the past 20 years, enables the integration of data into the design and construction. This technology is deemed capable of facilitating better collaboration between different project stakeholders. One of its functions is to serve as a visual aid for the team members in decision making. However, not all types of BIM are appropriately used in certain practices. This study looks at lean construction scheduling where BIM may be used differently because of the last planner system. The last planner system facilitates short term planning by allowing project team members to elaborate on their tasks in greater detail so that the team can identify potential constraints on project execution. The lack of visual reference, especially one that provides a logic sequence that is important during the planning, might help project stakeholders discover issues. However, the conventional schedule methods with 4D BIM are typically developed based on a CPM schedule where the detailed schedule is determined early by a schedule. Consequently, 4D BIM practices and the last planner scheduling techniques are not yet compatible. This study provides an analysis of current research trends around the topic of visualization in lean construction project scheduling. Findings indicated that existing publications tend to focus on the technology instead of the underlying communication theory between project participants. From the technology side, this study is limited to studying the utilization of emerging technologies such as BIM. Thus, several suggestions were made on how emerging technology can be implemented in certain aspects of a lean project.
引用
收藏
页码:455 / 463
页数:9
相关论文
共 50 条
  • [21] Lean Scheduling: Balancing Work and Streamlining the Cytotechnologist Scheduling Process
    Saccomanno, Gina
    Kane, Lindsey
    Amsden, Erin
    Bridgeman, Andrew
    Sorenson, Angela
    Root, Renee
    Hansing, Kara
    Ihrke, Johnita
    Nelson, Sally
    Zieman, Angela
    del Rosario, Kristina
    Tuve, Delores
    Henry, Michael
    CANCER CYTOPATHOLOGY, 2010, 118 (05) : 360 - 361
  • [22] Innovative construction management method: Assessment of lean construction implementation
    Daeyoung Kim
    Hee-Sung Park
    KSCE Journal of Civil Engineering, 2006, 10 (6) : 381 - 388
  • [23] Issues and Impact of Lean Construction Implementation in The Malaysian Construction Industry
    Marhani, Mohd Arif
    Othman, Nurul Ain Syafiqah Muhammad
    Ismail, Noor Akmal Addlah
    INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2021, 12 (03): : 258 - 268
  • [24] Developing an Ontology for Implementation of Lean Construction Methods in Construction Projects
    Bhawani, Sagata
    Messner, John
    Leicht, Robert
    CONSTRUCTION RESEARCH CONGRESS 2020: PROJECT MANAGEMENT AND CONTROLS, MATERIALS, AND CONTRACTS, 2020, : 427 - 435
  • [25] LEAN IMPLEMENTATION PROCESS IN SMALL COMPANIES
    Piskor, M.
    Kondic, V
    Maderic, D.
    TEHNICKI GLASNIK-TECHNICAL JOURNAL, 2011, 5 (01): : 103 - 108
  • [26] Problems in the Implementation of the Lean Concept in the Construction Industries
    Ulewicz, R.
    Ulewicz, M.
    PROCEEDINGS OF ADVANCES IN RESOURCE-SAVING TECHNOLOGIES AND MATERIALS IN CIVIL AND ENVIRONMENTAL ENGINEERING (CEE 2019), 2020, 47 : 495 - 500
  • [27] Enablers and Barriers of Lean Implementation in Construction Projects
    Bayhan, Hasan Gokberk
    Demirkesen, Sevilay
    Jayamanne, Eshan
    3RD WORLD MULTIDISCIPLINARY CIVIL ENGINEERING, ARCHITECTURE, URBAN PLANNING SYMPOSIUM (WMCAUS 2018), 2019, 471
  • [28] A Lean Implementation Success Model for the Construction Industry
    Demirkesen, Sevilay
    Bayhan, Hasan Gokberk
    ENGINEERING MANAGEMENT JOURNAL, 2020, 32 (03) : 219 - 239
  • [29] Exploring Barriers in the Implementation of Lean Construction Management
    Thoumy, Mira
    Harh, Atef
    Hajj, Claudette
    INNOVATION MANAGEMENT AND EDUCATION EXCELLENCE THROUGH VISION 2020, VOLS I -XI, 2018, : 4695 - 4705
  • [30] A simple visual aid for sugarcane irrigation scheduling
    Torres, JS
    AGRICULTURAL WATER MANAGEMENT, 1998, 38 (01) : 77 - 83