Optimal Maintenance Time for Repairable Systems Under Two Types of Failures

被引:5
|
作者
Colosimo, Enrico A. [1 ]
Gilardoni, Gustavo L. [2 ]
Santos, Wagner B. [3 ]
Motta, Sergio B. [3 ]
机构
[1] Univ Fed Minas Gerais, Dept Estat, ICEx, Belo Horizonte, MG, Brazil
[2] Univ Brasilia, Dept Stat, BR-70910900 Brasilia, DF, Brazil
[3] Elect Power Co Minas Gerais CEMIG, Belo Horizonte, MG, Brazil
关键词
Log-linear process; Maximum likelihood estimate; Minimal repair; Non homogeneous Poisson process; Power law process; PREVENTIVE MAINTENANCE; REPLACEMENT; POLICIES;
D O I
10.1080/03610920902940183
中图分类号
O21 [概率论与数理统计]; C8 [统计学];
学科分类号
020208 ; 070103 ; 0714 ;
摘要
Determination of preventive maintenance is an important issue for systems under degradation. A typical maintenance policy calls for complete preventive repair actions at pre-scheduled times and minimal repair actions whenever a failure occurs. Under minimal repair, failures are modeled according to a non homogeneous Poisson process. A perfect preventive maintenance restores the system to the as good as new condition. The motivation for this article was a maintenance data set related to power switch disconnectors. Two different types of failures could be observed for these systems according to their causes. The major difference between these types of failures is their costs. Assuming that the system will be in operation for an infinite time, we find the expected cost per unit of time for each preventive maintenance policy and hence obtain the optimal strategy as a function of the processes intensities. Assuming a parametrical form for the intensity function, large sample estimates for the optimal maintenance check points are obtained and discussed.
引用
收藏
页码:1289 / 1298
页数:10
相关论文
共 50 条
  • [31] A MAINTENANCE MODEL FOR REPAIRABLE SYSTEMS
    TANG, LC
    OLORUNNIWO, FO
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 1989, 24 (01) : 21 - 32
  • [32] Estimating maintenance effectiveness of a repairable system under time-based preventive maintenance
    Syamsundar, A.
    Naikan, V. N. A.
    Wu, Shaomin
    COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 156
  • [33] PROPOSED PROCEDURE FOR OPTIMAL MAINTENANCE SCHEDULING UNDER EMERGENT FAILURES
    Al-Refaie, Abbas
    Al-Shalaldeh, Heba
    Lepkova, Natalija
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2020, 26 (04) : 396 - 409
  • [34] Availability and maintenance strategy under time-varying environments for redundant repairable systems with PH distributions
    Li, Yan
    Zhang, Wei
    Liu, Baoliang
    Wang, Xiaofeng
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2024, 246
  • [35] Optimal Inspection and Replacement Strategy for Systems Subject to Two Types of Failures with Adjustable Inspection Intervals
    马晓洋
    王文彬
    刘学娟
    彭锐
    JournalofShanghaiJiaotongUniversity(Science), 2017, 22 (06) : 752 - 755
  • [36] Optimal inspection and replacement strategy for systems subject to two types of failures with adjustable inspection intervals
    Ma X.
    Wang W.
    Liu X.
    Peng R.
    Ma, Xiaoyang (maxiaoyang0218@163.com), 1600, Shanghai Jiaotong University (22): : 752 - 755
  • [37] Intelligent optimal preventive replacement maintenance policy for non-repairable systems
    Ekpenyong, Moses Effiong
    Udoh, Nse Sunday
    COMPUTERS & INDUSTRIAL ENGINEERING, 2024, 190
  • [38] Nonparametric estimation and bootstrap confidence intervals for the optimal maintenance time of a repairable system
    Gilardoni, Gustavo L.
    de Oliveira, Maristela D.
    Colosimo, Enrico A.
    COMPUTATIONAL STATISTICS & DATA ANALYSIS, 2013, 63 : 113 - 124
  • [39] Markov Chain Profit Modelling and Evaluation between Two Dissimilar Systems under Two Types of Failures
    Bala, Saminu I.
    Yusuf, Ibrahim
    APPLICATIONS AND APPLIED MATHEMATICS-AN INTERNATIONAL JOURNAL, 2016, 11 (02): : 489 - 503
  • [40] Optimal preventive maintenance for repairable weighted k-out-of-n systems
    Hamdan, K.
    Tavangar, M.
    Asadi, M.
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2021, 205