Application of PSA Technology in Technical Requirements Optimization of Nuclear Power Plant

被引:1
|
作者
Yu, Xipeng [1 ]
Yang, Zhi [1 ]
机构
[1] Suzhou Nucl Power Res Inst, Nucl Safety & Operat Technol Ctr, Suzhou, Jiangsu, Peoples R China
来源
2022 4TH INTERNATIONAL CONFERENCE ON SYSTEM RELIABILITY AND SAFETY ENGINEERING, SRSE | 2022年
关键词
probabilistic safety analysis; risk-informed; technical requirements; incremental conditional probability;
D O I
10.1109/SRSE56746.2022.10067287
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Probabilistic safety analysis (PSA) technology has become the mainstream analysis method in the world to support the daily risk management and safety decision-making in nuclear power plants. A series of regulatory guidelines issued by the US Nuclear Regulatory Commission are used to guide the application for change of technical specifications, effectively improving the reliability of equipment. As for the unavailability of REA boration or RCV charging line, a nuclear power plant in China has optimized the transfer process of corresponding event procedures. In this paper, the risk-informed analysis technology is applied to analyze and determine whether the technical requirements related to the events could be optimized.
引用
收藏
页码:133 / 138
页数:6
相关论文
共 50 条
  • [41] Amendments of the existing guidance on PSA application to nuclear power plants in Germany
    Berg, H. P.
    Krauss, M.
    Roewekamp, M.
    SAFETY AND RELIABILITY: METHODOLOGY AND APPLICATIONS, 2015, : 1599 - 1604
  • [42] An introductory course of the Probabilistic Safety Assessment (PSA) for LWR - (2) Application of PSA technology to plant management
    Taminami, T
    Miyata, K
    JOURNAL OF THE ATOMIC ENERGY SOCIETY OF JAPAN, 2006, 48 (04): : 251 - 256
  • [43] The role of PSA in the design improvement program of the Korean Standard Nuclear Power Plant
    Kang, HS
    Cho, BO
    Park, KS
    Kang, SK
    Kim, MR
    PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT, VOL I AND II, PROCEEDINGS, 2002, : 7 - 12
  • [44] Level 2 PSA for the VVER 440/213 Dukovany nuclear power plant
    Dienstbier, J
    Hustak, S
    Rydl, A
    PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT, VOL 1- 6, 2004, : 296 - 301
  • [45] LEVEL 2 PSA OVERVIEW OF HPR1000 NUCLEAR POWER PLANT
    Wang, Ziguan
    Lu, Fang
    Yang, Benlin
    Chen, Shi
    Hu, Lingsheng
    PROCEEDINGS OF THE 2020 INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING (ICONE2020), VOL 2, 2020,
  • [46] Methodology issues and improvement in nuclear power plant PSA data development and update
    Xing, ML
    Licata, RL
    Gaynor, DE
    PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT, VOL I AND II, PROCEEDINGS, 2002, : 1507 - 1512
  • [47] COMPARISON OF TECHNICAL STANDARDS BETWEEN BURIED AND ABOVE GROUND POLYETHYLENE PIPE IN THE APPLICATION OF NUCLEAR POWER PLANT
    Shi, Jianfeng
    Cao, Yuhua
    Jiao, Di
    Yu, Fa
    Li, Yu
    Jiang, Jiayin
    Zheng, Jinyang
    PROCEEDINGS OF ASME 2022 PRESSURE VESSELS AND PIPING CONFERENCE, PVP2022, VOL 1, 2022,
  • [48] Application of living PSA tool FT-FREE to safety management during operation and shutdown nuclear power plant
    Furuhashi, K
    Oyama, Y
    Tomisawa, S
    Suzuki, H
    Imamura, N
    Kawamata, K
    PSAM 5: PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT, VOLS 1-4, 2000, (34): : 863 - 868
  • [49] Things not modeled in nuclear plant PSA
    Bley, DC
    Wreathall, J
    Cooper, SE
    PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT (PSAM 4), VOLS 1-4, 1998, : 932 - 936
  • [50] Application of nuclear power technology to other industry
    Oka, Y
    Uchikawa, S
    Funada, T
    Ozaki, O
    JOURNAL OF THE ATOMIC ENERGY SOCIETY OF JAPAN, 1997, 39 (02): : 135 - 142