Benders decomposition method for an integrated problem of production Lot-sizing and Scheduling

被引:0
|
作者
Ouerfelli, Hela [1 ]
Dammak, Abdelaziz [1 ]
Chtourou, Emna Kallel [2 ]
机构
[1] Univ Sfax, Dept Appl Quantitat Methods, GIAD Lab, FSEG, Route Aerodrome,Km4,BP 1088, Sfax 3018, Tunisia
[2] Univ Sfax, LOGIQ Lab, ISGI, Sfax, Tunisia
关键词
Integration of Lot - Sizing and Scheduling (LSS) decisions in a job-shop; Integer Programming; Benders decomposition method;
D O I
10.1109/ICCIE.2009.5223790
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
The main objective of the current work is to present mathematical model and a decision method for production planning issues of a manufacturing organization. It is therefore meant to integrate the medium term and the short term as two levels of decision. These consist in periodical planning with determining the intended produced quantity and scheduling the functioning of machines. It is worth noting that in the literature there exist only few works on the issue of integration because of the shortage of numerical results. Thus, the integrated model presented here allows us to take into consideration the scheduling constraints in the Lot-sizing model. A recent algorithm, based on a heuristic approach to find a production planning with a feasible schedule for each period, has recently been published in which the two levels of decision were applied. In this paper, some of these ideas are developed in order to get an optimal solution. For this, an exact algorithm of Benders' decomposition method is adopted to the integration problem. This has been proved efficient with reliance primarily on modeling view and the link between the two levels of decision and secondly on the numerical view.
引用
收藏
页码:323 / +
页数:2
相关论文
共 50 条
  • [21] Decomposition based heuristic algorithm for lot-sizing and scheduling problem treating time horizon as a continuum
    Kim, Seong-in
    Han, Junghee
    Lee, Youngho
    Park, Eunkyung
    COMPUTERS & OPERATIONS RESEARCH, 2010, 37 (02) : 302 - 314
  • [22] Solving a Production Lot-Sizing and Scheduling Problem from an Enhanced Inventory Management Perspective
    Popovic, Drazen
    Bjelic, Nenad
    Vidovic, Milorad
    Ratkovic, Branislava
    MATHEMATICS, 2023, 11 (09)
  • [23] Lot-sizing and scheduling problem with earliness tardiness and setup penalties
    Supithak, Wisut
    Liman, Surya D.
    Montes, Elliot J.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2010, 58 (03) : 363 - 372
  • [24] Benders decomposition with special purpose method for the sub problem in lot sizing problem under uncertain demand
    Witthayapraphakorn, Aphisak
    Charnsethikul, Peerayuth
    OPERATIONS RESEARCH PERSPECTIVES, 2019, 6
  • [25] Decomposition approach for a problem of lot-sizing and sequencing under uncertainties
    Dolgui, A
    Levin, G
    Louly, MA
    INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2005, 18 (05) : 376 - 385
  • [26] ANALYSIS OF LAGRANGIAN DECOMPOSITION FOR THE MULTIITEM CAPACITATED LOT-SIZING PROBLEM
    THIZY, JM
    INFOR, 1991, 29 (04) : 271 - 283
  • [27] A matheuristic approach for an integrated lot-sizing and scheduling problem with a period-based learning effect
    Rohaninejad, Mohammad
    Vahedi-Nouri, Behdin
    Tavakkoli-Moghaddam, Reza
    Hanzalek, Zdenek
    EXPERT SYSTEMS WITH APPLICATIONS, 2025, 269
  • [28] MULTI-OBJECTIVE OPTIMIZATION OF INTEGRATED LOT-SIZING AND SCHEDULING PROBLEM IN FLEXIBLE JOB SHOPS
    Rohaninejad, Mohammad
    Sahraeian, Rashed
    Nouri, Behdin Vahedi
    RAIRO-OPERATIONS RESEARCH, 2016, 50 (03) : 587 - 609
  • [29] TIME-VARIANT LOT-SIZING MODELS FOR THE WAREHOUSE SCHEDULING PROBLEM
    HARIGA, MA
    JACKSON, PL
    IIE TRANSACTIONS, 1995, 27 (02) : 162 - 170
  • [30] Asynchronous teams for joint lot-sizing and scheduling problem in flow shops
    Belo Filho, Marcio A. F.
    Santos, Maristela O.
    Meneses, Claudio N.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (20) : 5809 - 5822