Benders decomposition method for an integrated problem of production Lot-sizing and Scheduling

被引:0
|
作者
Ouerfelli, Hela [1 ]
Dammak, Abdelaziz [1 ]
Chtourou, Emna Kallel [2 ]
机构
[1] Univ Sfax, Dept Appl Quantitat Methods, GIAD Lab, FSEG, Route Aerodrome,Km4,BP 1088, Sfax 3018, Tunisia
[2] Univ Sfax, LOGIQ Lab, ISGI, Sfax, Tunisia
关键词
Integration of Lot - Sizing and Scheduling (LSS) decisions in a job-shop; Integer Programming; Benders decomposition method;
D O I
10.1109/ICCIE.2009.5223790
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
The main objective of the current work is to present mathematical model and a decision method for production planning issues of a manufacturing organization. It is therefore meant to integrate the medium term and the short term as two levels of decision. These consist in periodical planning with determining the intended produced quantity and scheduling the functioning of machines. It is worth noting that in the literature there exist only few works on the issue of integration because of the shortage of numerical results. Thus, the integrated model presented here allows us to take into consideration the scheduling constraints in the Lot-sizing model. A recent algorithm, based on a heuristic approach to find a production planning with a feasible schedule for each period, has recently been published in which the two levels of decision were applied. In this paper, some of these ideas are developed in order to get an optimal solution. For this, an exact algorithm of Benders' decomposition method is adopted to the integration problem. This has been proved efficient with reliance primarily on modeling view and the link between the two levels of decision and secondly on the numerical view.
引用
收藏
页码:323 / +
页数:2
相关论文
共 50 条
  • [1] Benders-based approach for an integrated Lot-Sizing and Scheduling problem
    Ouerfelli, Hela
    Dammak, Abdelaziz
    Kallel Chtourou, Emna
    INTERNATIONAL JOURNAL OF COMBINATORIAL OPTIMIZATION PROBLEMS AND INFORMATICS, 2012, 3 (03): : 59 - 68
  • [2] Matheuristic for the lot-sizing and scheduling problem in integrated pulp and paper production
    Furlan, Marcos
    Almada-Lobo, Bernardo
    Santos, Maristela
    Morabito, Reinaldo
    COMPUTERS & INDUSTRIAL ENGINEERING, 2024, 192
  • [3] An approach for integrated scheduling and lot-sizing
    Jodlbauer, H
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 172 (02) : 386 - 400
  • [4] A Lagrangian heuristic for an integrated lot-sizing and fixed scheduling problem
    Wolosewicz, Cathy
    Dauzere-Peres, Stephane
    Aggoune, Riad
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 244 (01) : 3 - 12
  • [5] THE DISCRETE LOT-SIZING AND SCHEDULING PROBLEM
    FLEISCHMANN, B
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1990, 44 (03) : 337 - 348
  • [6] AN INTEGRATED UTILISATION, SCHEDULING AND LOT-SIZING ALGORITHM FOR PULL PRODUCTION
    Adetunji, Olufemi A. B.
    Yadavalli, Venkata S. S.
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2012, 19 (03): : 171 - 180
  • [7] Solving the integrated lot-sizing and job-shop scheduling problem
    Urrutia, Edwin David Gomez
    Aggoune, Riad
    Dauzere-Peres, Stephane
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (17) : 5236 - 5254
  • [8] An exact optimization approach for an integrated process configuration, lot-sizing, and scheduling problem
    Martinez, Karim Perez
    Adulyasak, Yossiri
    Jans, Raf
    Morabito, Reinaldo
    Vitor Toso, Eli Angela
    COMPUTERS & OPERATIONS RESEARCH, 2019, 103 : 310 - 323
  • [9] Economic Lot-Sizing for Integrated Production and Transportation
    Hwang, Hark-Chin
    OPERATIONS RESEARCH, 2010, 58 (02) : 428 - 444
  • [10] A New Algorithm for the Capacitated Lot-sizing and Scheduling Problem
    Ma, Jia
    Shi, Gang
    LEMLID: 2008 NORTHEAST ASIA LOGISTICS ENGINEERING AND MODERN LOGISTICS INDUSTRY DEVELOPMENT, PROCEEDINGS, 2008, : 16 - 20