An Assembly Sequence Planning Framework for Complex Data using General Voronoi Diagram

被引:2
|
作者
Dorn, Sebastian [1 ]
Wolpert, Nicola [2 ]
Schoemer, Elmar [3 ]
机构
[1] Mercedes Benz AG, Prod Planning, Stuttgart, Germany
[2] Univ Appl Sci Stuttgart, Dept Geomat Comp Sci & Math, Stuttgart, Germany
[3] Johannes Gutenberg Univ Mainz, Dept Phys Math & Comp Sci, Mainz, Germany
关键词
ALGORITHMS;
D O I
10.1109/ICRA46639.2022.9811867
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
We present the first realization of an assembly sequence planning framework for large-scale and complex 3D real-world CAD scenarios. Other than in academic benchmark data sets, in our scenario each assembled part is allowed to contain flexible fastening elements and the number of assembled parts is quite high. With our framework we are able to derive a meaningful assembly priority graph for the parts. Our framework divides the disassembly motion of each part into a NEAR- and a subsequent FAR planning phase and uses existing specialized motion planners for each phase. To reduce the number of unsuccessful motion planning requests we use a general Voronoi diagram graph and a novel collision perceiving method which significantly speed up our framework. At the end, we create an assembly priority graph to indicate which parts must be disassembled before others. In our experiments, we show that our framework is the first one which is able to generate a priority graph for a representative data set from the automotive industry. Moreover, the reported disassembly motions for the individual parts are shorter and can be computed faster than with other state-of-the-art frameworks.
引用
收藏
页码:9896 / 9902
页数:7
相关论文
共 50 条
  • [41] Assembly sequence planning using soft computing methods: A review
    Deepak, B. B. V. L.
    Murali, G. Bala
    Bahubalendruni, M. V. A. Raju
    Biswal, B. B.
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART E-JOURNAL OF PROCESS MECHANICAL ENGINEERING, 2019, 233 (03) : 653 - 683
  • [42] Assembly sequence planning based on particle swarm optimization algorithm for complex product
    Yu, Hong
    Wang, Cheng-En
    Yu, Jia-Peng
    Yuan, Hui
    Dongbei Daxue Xuebao/Journal of Northeastern University, 2010, 31 (02): : 261 - 264
  • [43] Adaptive quantum genetic algorithm for task sequence planning of complex assembly systems
    Zhang, Linbin
    Lv, Huanpei
    Tan, Dapeng
    Xu, Fang
    Chen, Jiaoliao
    Bao, Guanjun
    Cai, Shibo
    ELECTRONICS LETTERS, 2018, 54 (14) : 870 - 871
  • [44] Using the delaunay triangulation/voronoi diagram to extract building information from raw LIDAR data
    Tse, Rebecca
    Gold, Chris
    Kidner, Dave
    ISVD 2007: THE 4TH INTERNATIONAL SYMPOSIUM ON VORONOI DIAGRAMS IN SCIENCE AND ENGINEERING 2007, PROCEEDINGS, 2007, : 222 - +
  • [45] A Novel Parallel Assembly Sequence Planning Method for Complex Products Based on PSOBC
    Yang, Yanfang
    Yang, Miao
    Shu, Liang
    Li, Shasha
    Liu, Zhiping
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2020, 2020
  • [46] A sequential consideration for assembly sequence planning and assembly line balancing using the connector concept
    Tseng, HE
    Tang, CE
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2006, 44 (01) : 97 - 116
  • [47] Efficient method of assembly sequence planning based on GAAA and optimizing by assembly path feedback for complex product
    Cheng Hui
    Li Yuan
    Zhang Kai-fu
    The International Journal of Advanced Manufacturing Technology, 2009, 42 (11-12) : 1205 - 1205
  • [48] Efficient method of assembly sequence planning based on GAAA and optimizing by assembly path feedback for complex product
    Hui, Cheng
    Yuan, Li
    Kai-fu, Zhang
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 42 (11-12): : 1187 - 1204
  • [49] Efficient method of assembly sequence planning based on GAAA and optimizing by assembly path feedback for complex product
    Cheng Hui
    Li Yuan
    Zhang Kai-fu
    The International Journal of Advanced Manufacturing Technology, 2009, 42 : 1187 - 1204
  • [50] Simulation-based Planning of a Kind of Complex Product General Assembly Line
    Zhou, Wei
    Li, Shiqi
    Huang, Yaqin
    Wang, Junfeng
    7TH CIRP CONFERENCE ON ASSEMBLY TECHNOLOGIES AND SYSTEMS (CATS 2018), 2018, 76 : 25 - 30