Numerical evaluation of surface settlement induced by ground loss from the face and annular gap of EPB shield tunneling

被引:7
|
作者
An, Jun-Beom [1 ]
Kang, Seok-Jun [1 ]
Cho, Gye-Chun [1 ]
机构
[1] Korea Adv Inst Sci & Technol, Dept Civil & Environm Engn, 291 Daehak Ro, Daejeon 34141, South Korea
基金
新加坡国家研究基金会;
关键词
EPB shield TBM; excessive excavation; face pressure; ground loss; surface settlement; tail void grouting pressure; PREDICTION; STABILITY; PRESSURE;
D O I
10.12989/gae.2022.29.3.291
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Tunnel boring machines combined with the earth pressure balanced shield method (EPB shield TBMs) have been adopted in urban areas as they allow excavation of tunnels with limited ground deformation through continuous and repetitive excavation and support. Nevertheless, the expansion of TBM construction requires much more minor and exquisitely controlled surface settlement to prevent economic loss. Several parametric studies controlling the tunnel's geometry, ground properties, and TBM operational factors assuming ordinary conditions for EPB shield TBM excavation have been conducted, but the impact of excessive excavation on the induced settlement has not been adequately studied. This study conducted a numerical evaluation of surface settlement induced by the ground loss from face imbalance, excessive excavation, and tail void grouting. The numerical model was constructed using FLAC3D and validated by comparing its result with the field data from literature. Then, parametric studies were conducted by controlling the ground stiffness, face pressure, tail void grouting pressure, and additional volume of muck discharge. As a result, the contribution of these operational factors to the surface settlement appeared differently depending on the ground stiffness. Except for the ground stiffness as the dominant factor, the order of variation of surface settlement was investigated, and the volume of additional muck discharge was found to be the largest, followed by the face pressure and tail void grouting pressure. The results from this study are expected to contribute to the development of settlement prediction models and understanding the surface settlement behavior induced by TBM excavation.
引用
收藏
页码:291 / 300
页数:10
相关论文
共 50 条
  • [21] Prediction of Ground Surface Settlements Induced by EPB Shield Tunneling in Water-Rich Soft Strata
    Yang, Yi
    Li, Xinggao
    Jin, Dalong
    Jiang, Xingqi
    Li, Hanyuan
    APPLIED SCIENCES-BASEL, 2022, 12 (09):
  • [22] Ground Surface Displacements and Failure Mechanisms induced by EPB Shield Tunneling Method and Groundwater Levels Changes
    Ramin Vali
    Farah Foroughi Boroujeni
    Transportation Infrastructure Geotechnology, 2023, 10 : 616 - 638
  • [23] Numerical Analysis of Influence of Double-line Tunnel Shield Tunneling on Ground Surface Settlement
    Feng, Huijun
    Yu, Rangang
    Journal of Railway Engineering Society, 2019, 36 (03) : 78 - 83
  • [24] 3-D numerical simulation of ground surface settlement under overlapped shield tunneling
    Sun, Jun
    Liu, Hong-Zhou
    Tongji Daxue Xuebao/Journal of Tongji University, 2002, 30 (04): : 379 - 385
  • [25] Analysis of ground volume loss for EPB shield tunneling in thick silty clay layer
    Rong, Xuening
    Gao, Lirong
    Han, Aimin
    Wu, Jiaqi
    Wu, Xuan
    Jiang, Gang
    ALEXANDRIA ENGINEERING JOURNAL, 2024, 96 : 295 - 302
  • [26] Predicting earth pressure balance (EPB) shield tunneling-induced ground settlement in compound strata using random forest
    Ling, Xianzhang
    Kong, Xiangxun
    Tang, Liang
    Zhao, Yize
    Tang, Wenchong
    Zhang, Yifan
    TRANSPORTATION GEOTECHNICS, 2022, 35
  • [27] Support vector regression with heuristic optimization algorithms for predicting the ground surface displacement induced by EPB shield tunneling
    Lu, Dechun
    Ma, Yiding
    Kong, Fanchao
    Guo, Caixia
    Miao, Jinbo
    Du, Xiuli
    GONDWANA RESEARCH, 2023, 123 : 3 - 15
  • [28] Predicting Maximum Settlement Induced by EPB Shield Tunneling Through Image Processing and an Intelligent Approach
    Yazdanparast, Mehdi
    Koushkgozar, Hossein Ayyab
    Hassanpour, Jafar
    Kahaki, Abolfazl
    Khodagholi, Mohsen
    KSCE JOURNAL OF CIVIL ENGINEERING, 2024, 28 (09) : 4076 - 4087
  • [29] 3-Dimensional numerical modeling of SPB shield TBM tunneling-induced ground settlement considering volume loss processes
    Park, Hyunku
    Chang, Seokbue
    Lee, Seungbok
    GEOTECHNICAL ASPECTS OF UNDERGROUND CONSTRUCTION IN SOFT GROUND, 2014, : 221 - 224
  • [30] Numerical research on face movement and collapse of shield tunneling in silt ground
    Hangzhou Metro Co. Ltd., Hangzhou 310003, China
    不详
    不详
    不详
    Rock Soil Mech, 2007, SUPPL. (511-515):