Improving the Flexibility and Reliability of Steam Power Units at Thermal Power Plants

被引:0
|
作者
Radin, Yu A. [1 ]
机构
[1] All Russia Thermal Engn Inst, Moscow 115280, Russia
关键词
power unit; supercritical pressure; boiler; steam turbine; drum; header; thermal and cyclic strength; automated process control system; thermal power plant; combined heat and power plant;
D O I
10.1134/S0040601521060070
中图分类号
O414.1 [热力学];
学科分类号
摘要
Information about the research activities conducted at the All-Russia Thermal Engineering Institute (VTI) in the field of flexibility of steam power units at thermal power plants (TPPs) is given. Many of these activities were conducted jointly with specialists of Firm ORGRES, TsKTI, power machinery building works, and power plants. As a result of these activities, thermal cycle and starting process circuits, standardized technologies, and instructions on starting TPP power units for capacities of 200-800 MW and power units of combined heat and power plants (CHPPs) equipped with 100-250-MW turbines have been developed. An important line of activities on substantiating the power equipment's flexibility characteristics was concerned with ensuring the thermal and cyclic strength of highly stressed parts of power-generating boilers and steam turbines, which led to the development of mathematical models of drums and boiler steam superheater outlet headers, steam lines, cylinders, and turbine rotors and the casings of high- and intermediate-pressure valves. Regulatory documents, technical requirements for power unit flexibility, starting fuel loss values, minimum loads and their variation rate within the adjustment range, keeping the power unit in the idle mode and in the mode of supplying power to in-house loads after full load rejection and generator disconnection from the grid, fast turbine valving, and the number of these operations were developed. Efforts aimed at improving the flexibility generated the need to automate the control and develop the appropriate process algorithms, the implementation of which has led to widespread introduction of microprocessor-based automated process control systems. Among the persons who made a great contribution in the arrangement and implementation of these activities were the leading specialists of VTI and the power industry V.B. Rubin, G.I. Moseev, E.R. Plotkin, B.I. Shmukler, A.L. Shvarts, N.I. Davydov, N.F. Komarov, E.N. Sergievskaya, V.F. Rezinskikh, A.Sh. Leizerovich, and others. The fundamental solutions adopted for steam power units were used in the last 20 years in elaborating the technology for starting combined cycle plants equipped with heat recovery steam generators. Among the totality of problems, the article addresses improvement of steam power unit flexibility, one of the basic lines the relevance of which is doubtless also at present.
引用
收藏
页码:481 / 489
页数:9
相关论文
共 50 条
  • [21] Adaptive control for the steam temperature of thermal power plants
    Matsumura, S
    Ogata, K
    Fujii, S
    Shioya, H
    PROCEEDINGS OF THE 1998 IEEE INTERNATIONAL CONFERENCE ON CONTROL APPLICATIONS, VOLS 1 AND 2, 1996, : 1105 - 1109
  • [22] Steam Power Plants
    Hawkins, R. R.
    LIBRARY JOURNAL, 1949, 74 (20) : 1758 - 1758
  • [23] Steam Power Plants
    不详
    LIBRARY JOURNAL, 1952, 77 (14) : 1309 - 1309
  • [24] Operational reliability and longevity of the feed pipelines of power units at thermal power stations
    Grin' E.A.
    Thermal Engineering, 2006, 53 (8) : 648 - 654
  • [25] Evaluating and improving the efficiency of steam power plants using chillers
    Hadizadeh, A.
    Paknafs, B.
    Javaherdeh, M.
    Naghashzadegan, H.
    MECHANICS & INDUSTRY, 2017, 18 (02)
  • [26] Ejectors of power plants turbine units efficiency and reliability increasing
    Aronson, K. E.
    Ryabchikov, A. Yu.
    Kuptsov, V. K.
    Murmanskii, I. B.
    Brodov, Yu. M.
    Zhelonkin, N. V.
    Khaet, S. I.
    INTERNATIONAL CONFERENCE PROBLEMS OF THERMAL PHYSICS AND POWER ENGINEERING (PTPPE-2017), 2017, 891
  • [27] Ways of Raising Welded Units Reliability in Power Plants.
    Zemlin, V.N.
    Energomashinostroenie, 1975, (12): : 16 - 18
  • [28] Some ways for improving the reliability and economical operation of wet-steam turbines of power-generating units
    Fadeev, I.P.
    Radik, S.V.
    Mokravtsov, M.V.
    Teploenergetika, 1993, (03): : 19 - 21
  • [29] Use of GTÉ-65 gas turbine power units in the thermal configuration of steam-gas systems for the refitting of operating thermal electric power plants
    Lebedev A.S.
    Kovalevskii V.P.
    Getmanov E.A.
    Ermaikina N.A.
    Power Technology and Engineering, 2008, 42 (4) : 236 - 246
  • [30] Peak shaving and heat supply flexibility of thermal power plants
    Wang, Congyu
    Song, Jiwei
    Zhu, Lingkai
    Zheng, Wei
    Liu, Zhaozhao
    Lin, Chengkun
    APPLIED THERMAL ENGINEERING, 2021, 193