Using elitist particle swarm optimization to facilitate bicriterion time-cost trade-off analysis

被引:70
|
作者
Yang, I-Tung [1 ]
机构
[1] Natl Taiwan Univ Sci & Technol, Dept Construct Engn, Taipei 106, Taiwan
关键词
D O I
10.1061/(ASCE)0733-9364(2007)133:7(498)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The present study develops a new optimization algorithm to find the complete time-cost profile (Pareto front) over a set of feasible project durations, i.e., it solves the time-cost trade-off problem. To improve existing methods, the proposed algorithm aims to achieve three goals: (1) to obtain the entire Pareto front in a single run; (2) to be insensitive to the scales of time and cost; and (3) to treat all existing types of activity time-cost functions, such as linear, nonlinear, discrete, discontinuous, and a hybrid of the above. The proposed algorithm modifies a population-based search procedure, particle swarm optimization, by adopting an elite archiving scheme to store nondominated solutions and by aptly using members of the archive to direct further search. Through a fast food outlet example, the proposed algorithm is shown effective and efficient in conducting advanced bicriterion time-cost analysis. Future applications of the proposed algorithm are suggested in the conclusion.
引用
收藏
页码:498 / 505
页数:8
相关论文
共 50 条
  • [31] Using machine learning and GA to solve time-cost trade-off problems
    Li, Heng
    Cao, J.-N.
    Love, P.E.D.
    Journal of Construction Engineering and Management, 125 (05): : 347 - 353
  • [32] Using genetic algorithms to solve construction time-cost trade-off problems
    Feng, CW
    Liu, LA
    Burns, SA
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 1997, 11 (03) : 184 - 189
  • [33] Closure to "Multiobjective Optimization of Time-Cost Trade-Off Using Harmony Search" by Zong Woo Geem
    Geem, Zong Woo
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2011, 137 (08): : 630 - 631
  • [34] MANAGING NEW PRODUCT TIME TO MARKET USING TIME-COST TRADE-OFF METHODS
    HAFFNER, EW
    GRAVES, RJ
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1988, 16 (02): : 117 - 124
  • [35] Using machine learning and GA to solve time-cost trade-off problems
    Li, H
    Cao, JN
    Love, PED
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 1999, 125 (05) : 347 - 353
  • [36] A time-cost trade-off model with resource consideration using genetic algorithm
    Chua, DKH
    Chan, WT
    Govindan, K
    CIVIL ENGINEERING SYSTEMS, 1997, 14 (04): : 291 - 311
  • [37] Multivariate Analysis on Time-Cost Trade-Off for Production and Installation in Industrialized Construction
    Xie, Haiyan
    Sumam, Rugma Jayachandrakumar
    Carey, Nicholas
    CONSTRUCTION RESEARCH CONGRESS 2020: PROJECT MANAGEMENT AND CONTROLS, MATERIALS, AND CONTRACTS, 2020, : 281 - 290
  • [38] Network analysis algorithm for the solution of discrete time-cost trade-off problem
    Önder Halis Bettemir
    M. Talat Birgönül
    KSCE Journal of Civil Engineering, 2017, 21 : 1047 - 1058
  • [39] The LP/IP hybrid method for construction time-cost trade-off analysis
    Department of General Engineering, Univ. Illinois at Urbana-Champaign, 104 S. Mathews Ave, Urbana, IL 61801, United States
    不详
    Constr. Manage. Econ., 3 (265-276):
  • [40] A Multi-objective Genetic Algorithm for Optimization Time-Cost Trade-off Scheduling
    Aghassi, Hadi
    Abadi, Sedigheh Nader
    Roghanian, Emad
    KNOWLEDGE TECHNOLOGY, 2012, 295 : 356 - +