An evaluation of the applicability of 4D CAD on construction projects

被引:93
|
作者
Mahalingam, Ashwin [1 ]
Kashyap, Rahul [2 ]
Mahajan, Charudatta [3 ]
机构
[1] Indian Inst Technol Madras, Madras 600036, Tamil Nadu, India
[2] Cushman & Wakefield India Pvt Ltd, Dev Projects, Madras, Tamil Nadu, India
[3] Larsen & Toubro, ECC, Bombay, Maharashtra, India
关键词
4D CAD; Commercial projects; Infrastructure projects; Benefits; Visualization; Constructability; Project progress review;
D O I
10.1016/j.autcon.2009.11.015
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
4D CAD models that integrate physical 3D elements with time, have been used to visualize construction processes in several projects worldwide. 4D models have been used and have been shown to have benefits over processes that span the entire lifecycle of a project such as collaboration with stakeholders, making design decisions, assessing project constructability, identifying spatial conflicts in construction and so on. Despite these benefits, several organizational and project-specific barriers have hindered the widespread adoption of 4D CAD. In order to reconcile the theoretical benefits of 4D models with the practical difficulties faced in implementation, there is an urgent need to explore the implementation of 4D models on construction sites as well as the perceptions of intended users/beneficiaries towards this implementation. This paper aims to address this need and contribute to our understanding of how 4D models must be introduced, positioned and implemented on construction sites, so as to maximize both their acceptability and their usefulness. We describe two 4D models of infrastructure projects and two 4D models of commercial projects that have been built and implemented. Through a process of structured and unstructured interviewing the paper gauges the response of project participants across various organizational levels on each of these projects as to the usefulness of 4D in project planning and control. Through qualitative and statistical analysis of the data we establish that 4D CAD is likely to be most beneficial in the project shaping or planning stage and in the construction stage. In the project shaping stage, 4D CAD is likely to be particularly useful in communicating construction plans and processes to clients, while during the construction phase, 4D CAD is likely to be particularly useful in comparing the constructability of work methods visually in order to detect conflicts or clashes, and as a visual tool for contractors, clients, subcontractors and vendors to review and plan project progress. Further, upper management and site workers are more likely to use and derive benefits from the visualization of processes using 4D given their lack of site related knowledge or skills, while construction professionals who are more construction-savvy are more likely to appreciate and benefit from the analytical and planning aids that 4D simulations provide during the construction phase. However, it is likely that despite these benefits 4D CAD models might not diffuse through the construction industry unless 4D modelling and analysis is integrated into existing project planning approaches. The paper concludes with a brief discussion on future 4D software development that seeks to bring about such integration and leverages the benefits of 4D CAD to bring about improved operational efficiencies on construction sites. (C) 2009 Elsevier B.V. All rights reserved.
引用
收藏
页码:148 / 159
页数:12
相关论文
共 50 条
  • [21] Development of Improved 4D CAD System for Horizontal Works in Civil Engineering Projects
    Kang, Leenseok
    Pyeon, Jaeho
    Moon, Hyounseok
    Kim, Changhak
    Kang, Minsu
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2013, 27 (03) : 212 - 230
  • [22] 4D CAD Based Method for Supporting Coordination of Urban Subsurface Utility Projects
    Scholtenhuis, Leon L. Olde
    Hartmann, Timo
    Doree, Andre G.
    AUTOMATION IN CONSTRUCTION, 2016, 62 : 66 - 77
  • [23] Integration of Radio-Frequency Identification and 4D CAD in Construction Management
    胡文发
    TsinghuaScienceandTechnology, 2008, (S1) : 151 - 157
  • [24] 4D CAD models to support the coordination of construction activities between contractors
    Trebbe, Martijn
    Hartmann, Timo
    Doree, Andre
    AUTOMATION IN CONSTRUCTION, 2015, 49 : 83 - 91
  • [25] An integrated safety management with construction management using 4D CAD model
    Benjaoran, Vacharapoom
    Bhokha, Sdhabhon
    SAFETY SCIENCE, 2010, 48 (03) : 395 - 403
  • [26] Application of VR Technology linked with 4D CAD System for Construction Project
    Kang, Leen-Seok
    Moon, Hyoun-Seok
    Park, Seo-Young
    Kim, Hyoun-Seong
    Kim, Chang-Hak
    2009 INTERNATIONAL CONFERENCE ON NEW TRENDS IN INFORMATION AND SERVICE SCIENCE (NISS 2009), VOLS 1 AND 2, 2009, : 1058 - +
  • [27] Comparison of simulation-driven construction operations visualization and 4D CAD
    Kamat, VR
    Martinez, JC
    PROCEEDINGS OF THE 2002 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, 2002, : 1765 - 1770
  • [28] 4D CAD-based evaluation system for crane deployment plans in construction of nuclear power plants
    Sugimoto, Y.
    Seki, H.
    Samo, T.
    Nakamitsu, N.
    AUTOMATION IN CONSTRUCTION, 2016, 71 : 87 - 98
  • [29] Utilization of 2D, 3D, or 4D CAD in construction communication documentation
    Cory, CA
    FIFTH INTERNATIONAL CONFERENCE ON INFORMATION VISUALISATION, PROCEEDINGS, 2001, : 219 - 224
  • [30] SELECTION AND EVALUATION OF COLOR SCHEME FOR 4D CONSTRUCTION MODELS
    Chen, Ya-Hsin
    Tsai, Meng-Han
    Kang, Shih-Chung
    Liu, Chin-Wei
    JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION, 2013, 18 : 1 - 19