Failure Analysis of a High Voltage Feedthrough of Indus-2 Synchrotron Radiation Source

被引:0
|
作者
Gupta, R. K. [1 ]
Ittoop, M. O. [1 ]
Rai, S. K. [1 ]
Singh, R. [1 ]
Singh, M. K. [1 ]
Ganesh, P. [1 ]
Kaul, R. [1 ]
机构
[1] Raja Ramanna Ctr Adv Technol, PO CAT, Indore 452013, India
来源
关键词
Feedthrough; High voltage; Ceramic insulator; Braze alloy; Failure analysis;
D O I
10.1515/pm-2021-0026
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
In this paper, a failure analysis of a high voltage feedthrough of the Indus 2 synchrotron radiation source which brought about venting of the vacuum chamber is discussed. A detailed failure analysis demonstrated that the main cause responsible for the failure of the feedthrough was high humidity in the atmosphere surrounding the feedthrough assembly, which resulted in the corrosion of CuSil braze filler alloy at the ground terminal and also caused flashover between positive (+) and ground terminals. Thermal cycling of the insulator due to flashover resulted in spalling of giazed surface layer and assisted crack propagation from flashover-generated surface defects. The remedial measures recommended to avoid similar failure include: thorough cleaning of feedthrough and its connectors before installation, use gasket-type sealing in the protective cover of the connector on the air side, use of metallic tubes in place of polyurethane cooling water tubes and design change of feedthrough to shift brazed joint to vacuum side.
引用
收藏
页码:354 / 375
页数:22
相关论文
共 50 条
  • [1] Synchrotron radiation source INDUS-2
    Singh, G
    Sahoo, GK
    Angal, D
    Singh, AB
    Ghodke, AD
    Kant, P
    INDIAN JOURNAL OF PURE & APPLIED PHYSICS, 1997, 35 (03) : 183 - 192
  • [2] Measurement of parameters in Indus-2 synchrotron radiation source
    Ghodke, A. D.
    Husain, Riyasat
    Kumar, Pradeep
    Yadav, Surendra
    Puntambekar, T. A.
    REVIEW OF SCIENTIFIC INSTRUMENTS, 2012, 83 (10):
  • [3] Indus-2 Synchrotron Radiation Source: current status and utilization
    Deb, S. K.
    Singh, Gurnam
    Gupta, P. D.
    11TH INTERNATIONAL CONFERENCE ON SYNCHROTRON RADIATION INSTRUMENTATION (SRI 2012), 2013, 425
  • [4] Development of beamline radiation shielding hutch for Indus-2 synchrotron radiation source
    Chouksey, Sanjay
    INDIAN JOURNAL OF PURE & APPLIED PHYSICS, 2012, 50 (11) : 782 - 784
  • [5] Klystron Bias Power Supplies for Indus-2 Synchrotron Radiation Source
    Badapanda, M. K.
    Hannurkar, P. R.
    IETE JOURNAL OF RESEARCH, 2008, 54 (06) : 403 - 413
  • [6] Measurement, analysis and correction of the closed orbit distortion in Indus-2 synchrotron radiation source
    RIYASAT HUSAIN
    A D GHODKE
    SURENDRA YADAV
    A C HOLIKATTI
    R P YADAV
    P FATNANI
    T A PUNTAMBEKAR
    P R HANNURKAR
    Pramana, 2013, 80 : 263 - 275
  • [7] Measurement, analysis and correction of the closed orbit distortion in Indus-2 synchrotron radiation source
    Husain, Riyasat
    Ghodke, A. D.
    Yadav, Surendra
    Holikatti, A. C.
    Yadav, R. P.
    Fatnani, P.
    Puntambekar, T. A.
    Hannurkar, P. R.
    PRAMANA-JOURNAL OF PHYSICS, 2013, 80 (02): : 263 - 275
  • [8] Synchrotron radiation sources INDUS-1 and INDUS-2
    D D Bhawalkar
    G Singh
    R V Nandedkar
    Pramana, 1998, 50 : 467 - 484
  • [9] Synchrotron radiation sources INDUS-1 and INDUS-2
    Bhawalkar, DD
    Singh, G
    Nandedkar, RV
    PRAMANA-JOURNAL OF PHYSICS, 1998, 50 (06): : 467 - 484
  • [10] 505 MHz RF grounding for INDUS-2, 2.5 GeV synchrotron radiation source
    Badapanda, MK
    Hannurkar, PR
    PROCEEDINGS OF THE 8TH INTERNATIONAL CONFERENCE ON ELECTROMAGNETIC INTERFERENCE AND COMPATIBILITY, 2003, : 101 - 108