共 50 条
- [41] Impact of interruptions on schedule execution in flexible manufacturing systems INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS, 2002, 14 (04): : 319 - 344
- [42] Impact of Interruptions on Schedule Execution in Flexible Manufacturing Systems International Journal of Flexible Manufacturing Systems, 2002, 14 : 319 - 344
- [43] Towards intelligent process supervision: industrial penicillin fermentation case study Comput Chem Eng, Suppl pt A (S545-S550):
- [46] Study on intelligent assembly process planning and execution system based on digital twin ROBOTIC INTELLIGENCE AND AUTOMATION, 2024, 44 (03): : 366 - 381
- [49] Next generation of flexible assembly systems INNOVATION IN MANUFACTURING NETWORKS, 2008, : 279 - +