共 50 条
- [21] Erratum to: Note to: a mathematical model and ant colony algorithm for multi-manned assembly line balancing problem The International Journal of Advanced Manufacturing Technology, 2017, 89 : 1941 - 1941
- [22] Multi-manned Assembly Line Balancing Problem with Skilled Workers: A New Mathematical Formulation IFAC PAPERSONLINE, 2017, 50 (01): : 1211 - 1216
- [23] A simulated annealing approach for multi-manned assembly line balancing problem type II IFAC PAPERSONLINE, 2015, 48 (03): : 2299 - 2304
- [25] A Water-Flow Like Algorithm for Solving U-Shaped Assembly Line Balancing Problems IEEE ACCESS, 2019, 7 : 129824 - 129833
- [26] Solving Fuzzy U-shaped Line Balancing Problem with Exact Method ADVANCED MECHANICAL ENGINEERING, PTS 1 AND 2, 2010, 26-28 : 1046 - 1051
- [29] Applying genetic algorithms to the U-shaped assembly line balancing problem 1998 IEEE INTERNATIONAL CONFERENCE ON EVOLUTIONARY COMPUTATION - PROCEEDINGS, 1998, : 96 - 101
- [30] Incorporating ergonomic risks into U-shaped assembly line balancing problem WPOM-WORKING PAPERS ON OPERATIONS MANAGEMENT, 2013, 4 (02): : 29 - 43