A minimum-cost thresholding technique for unsupervised change detection

被引:54
|
作者
Bruzzone, L
Prieto, DF
机构
[1] Univ Trent, DICA, I-38050 Trent, Italy
[2] Univ Genoa, DIBE, I-16145 Genoa, Italy
关键词
D O I
10.1080/014311600750037552
中图分类号
TP7 [遥感技术];
学科分类号
081102 ; 0816 ; 081602 ; 083002 ; 1404 ;
摘要
We propose an automatic thresholding technique for difference images in unsupervised change detection. Such a technique takes into account the different costs that may be associated with commission and omission errors in the selection of the decision threshold. This allows the generation of maps in which the overall change-detection cost is minimized, i.e. the more critical kind of error is reduced according to end-user requirements.
引用
收藏
页码:3539 / 3544
页数:6
相关论文
共 50 条
  • [41] ON THE MINIMUM-COST PROJECT SCHEDULE - COMMENT
    CHAPMAN, CB
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1995, 23 (04): : 467 - 468
  • [42] Unsupervised Change Detection in Polarimetric SAR Data With the Hotelling-Lawley Trace Statistic and Minimum-Error Thresholding
    Ghanbari, Mohsen
    Akbari, Vahid
    IEEE JOURNAL OF SELECTED TOPICS IN APPLIED EARTH OBSERVATIONS AND REMOTE SENSING, 2018, 11 (12) : 4551 - 4562
  • [43] MINIMUM-COST FLOWS IN CONVEX-COST NETWORKS
    HU, TC
    NAVAL RESEARCH LOGISTICS QUARTERLY, 1966, 13 (01): : 1 - &
  • [44] Coupled Minimum-Cost Flow Cell Tracking
    Padfield, Dirk
    Rittscher, Jens
    Roysam, Badrinath
    INFORMATION PROCESSING IN MEDICAL IMAGING, PROCEEDINGS, 2009, 5636 : 374 - +
  • [45] Submodularity of minimum-cost spanning tree games
    Kobayashi, Masayuki
    Okamoto, Yoshio
    NETWORKS, 2014, 63 (03) : 231 - 238
  • [46] MINIMUM-COST POLICY FOR PRODUCTION OF RADIOACTIVE ISOTOPES
    ECKHOFF, ND
    FAN, LT
    KIMEL, WR
    TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1967, 10 (01): : 47 - &
  • [47] Minimum-Cost Load-Balancing Partitions
    Aronov, Boris
    Carmi, Paz
    Katz, Matthew J.
    ALGORITHMICA, 2009, 54 (03) : 318 - 336
  • [48] MINIMUM-COST DESIGN OF FLEXIBLE PAVEMENTS.
    Rouphail, Nagui M.
    1600, (111):
  • [49] The determination of the path with minimum-cost norm value
    Paixao, JMP
    Martins, ED
    Rosa, MS
    Santos, JLE
    NETWORKS, 2003, 41 (04) : 184 - 196
  • [50] A MINIMUM-COST SATELLITE LAUNCHER .I.
    GODWIN, F
    SPACEFLIGHT, 1965, 7 (05): : 146 - &