A real-time interpolation strategy for transition tool path with C 2 and G 2 continuity

被引:7
|
作者
Wang, Hui [1 ]
Wu, Jianhua [1 ]
Liu, Chao [1 ]
Xiong, Zhenhua [1 ]
机构
[1] Shanghai Jiao Tong Univ, State Key Lab Mech Syst & Vibrat, Sch Mech Engn, Shanghai 200240, Peoples R China
关键词
Real-time interpolation strategy; Transition module; Look-ahead ACC/DEC scheduling module; Interpolation module; Real-time interpolation task; SHORT LINE SEGMENTS; MACHINE-TOOLS; ALGORITHM; CURVE; METHODOLOGY; G(2);
D O I
10.1007/s00170-018-2242-0
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
A typical interpolation strategy for line segments consists of a transition scheme, a Look-ahead ACC/DEC scheduling, and an interpolation algorithm. In these three parts, the main computation occurs in the first and second part. Some research work has been carried out to decrease the computation in the previous literatures, but these methods occupy a lot of computing resources for the optimization process during the calculation of transition curve parameters and feed rates. Consequently, the computational efficiency of interpolation strategy is greatly reduced. To deal with the issue, a real-time interpolation strategy is proposed in this paper. In the transition scheme, a B,zier curve is utilized to smooth the line segments. Based on the relationship among the approximation error, the approximation radius, and the transition curve, the curve can be directly generated when the approximation error is given. In the ACC/DEC scheduling, a 3-segment feed rate profile with jerk continuity is constructed. Meanwhile, a Look-ahead planning based on Backward Scanning and Forward Revision (BSFR) algorithm is utilized to eliminate redundant computation. Compared with Zhao's and Shi's strategy, the proposed strategy has the merits of C (2) and G (2) continuity for the tool path, jerk continuity for the tool movement, and distinguished real-time performance for interpolation. The experiments of 3D pentagram and 2D butterfly are carried out with different strategies and their results demonstrate that the interpolation efficiency can be greatly improved with the proposed strategy.
引用
收藏
页码:905 / 918
页数:14
相关论文
共 50 条
  • [31] Real-time optimized dispatching control strategy for EV V2G based on dynamic TOU price
    Wang, Ronggang
    Mini, Haitao
    Sun, Weiyi
    Jiang, Rui
    Liu, Zhitong
    2024 3RD INTERNATIONAL CONFERENCE ON ENERGY AND ELECTRICAL POWER SYSTEMS, ICEEPS 2024, 2024, : 1236 - 1243
  • [32] Real-time spacecraft intercept strategy on J2-perturbed orbits
    Oghim, Snyoll
    Leeghim, Henzeh
    Kim, Donghoon
    ADVANCES IN SPACE RESEARCH, 2019, 63 (02) : 1007 - 1016
  • [33] Real-time hardware implementation of 2-D convolution-based image interpolation
    Zhang, Hui
    Hu, Guangshu
    Qinghua Daxue Xuebao/Journal of Tsinghua University, 2007, 47 (06): : 885 - 888
  • [34] Real-time measurements of the interaction of GRK2 with the α2A-adrenergic receptor and Gβγ
    Krasel, C.
    Prokopets, O.
    Zindel, D.
    Buenemann, M.
    NAUNYN-SCHMIEDEBERGS ARCHIVES OF PHARMACOLOGY, 2013, 386 : S44 - S44
  • [35] Transition Curve with G2 Hermite Interpolation Condition
    Ahmad, Azhar
    Amat, Abdul Halim
    Ali, Jamaluddin Md
    PROCEEDINGS OF THE 21ST NATIONAL SYMPOSIUM ON MATHEMATICAL SCIENCES (SKSM21): GERMINATION OF MATHEMATICAL SCIENCES EDUCATION AND RESEARCH TOWARDS GLOBAL SUSTAINABILITY, 2014, 1605 : 250 - 255
  • [36] An adaptive real-time NURBS curve interpolation for 4-axis polishing machine tool
    Ji, Shijun
    Lei, Lianggen
    Zhao, Ji
    Lu, Xiuquan
    Gao, Hong
    ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2021, 67
  • [37] Optimal real-time distributed V2G and G2V management of electric vehicles
    Stuedli, Sonja
    Crisostomi, Emanuele
    Middleton, Richard
    Shorten, Robert
    INTERNATIONAL JOURNAL OF CONTROL, 2014, 87 (06) : 1153 - 1162
  • [38] Real-time exact contour error calculation of NURBS tool path for contour control
    Liu, Zhe
    Dong, Jingchuan
    Wang, Taiyong
    Ren, Chengzu
    Guo, Jianxin
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2020, 108 (9-10): : 2803 - 2821
  • [39] Real-time exact contour error calculation of NURBS tool path for contour control
    Liu, Zhe
    Dong, Jingchuan
    Wang, Taiyong
    Ren, Chengzu
    Guo, Jianxin
    International Journal of Advanced Manufacturing Technology, 2020, 108 (9-10): : 2803 - 2821
  • [40] Real-time exact contour error calculation of NURBS tool path for contour control
    Zhe Liu
    Jingchuan Dong
    Taiyong Wang
    Chengzu Ren
    Jianxin Guo
    The International Journal of Advanced Manufacturing Technology, 2020, 108 : 2803 - 2821