Coordinated Scheduling of Berth and Quay Crane Based on MAS

被引:0
|
作者
Zhao, Hui [1 ]
Cheng, Liqin [1 ]
机构
[1] Civil Aviat Univ China, Sch Econ & Management, Tianjin, Peoples R China
关键词
Berth; Quay; Collaborative; Agent;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
In order to improve the efficiency of a container terminal and shorten the turnaround time of ship in harbor, a coordinated scheduling strategy for berth and quay crane allocation based on MAS theory is put forward aiming at the relevance of berth and quay crane scheduling. Berth and quay crane are abstracted as distinct autonomy agent. The scheduling process is based on the interaction among multi agent. Simulation results show that the MAS scheduling strategy behaviors better than the central dispatching strategy.
引用
收藏
页码:328 / 331
页数:4
相关论文
共 50 条
  • [41] A robust multiobjective model for the integrated berth and quay crane scheduling problem at seaside container terminals
    Abtin Nourmohammadzadeh
    Stefan Voß
    Annals of Mathematics and Artificial Intelligence, 2022, 90 : 831 - 853
  • [42] A Genetic Algorithm for Berth Allocation and Quay Crane Assignment
    Rodriguez-Molins, Mario
    Barber, Federico
    Sierra, Maria R.
    Puente, Jorge
    Salido, Miguel A.
    ADVANCES IN ARTIFICIAL INTELLIGENCE - IBERAMIA 2012, 2012, 7637 : 601 - 610
  • [43] Berth and quay crane allocation and scheduling problem with renewable energy uncertainty: A robust exact decomposition
    Chargui, Kaoutar
    Zouadi, Tarik
    Sreedharan, V. Raja
    COMPUTERS & OPERATIONS RESEARCH, 2023, 156
  • [44] The Quay Crane Scheduling Problem
    Al-Dhaheri, Noura
    Diabat, Ali
    JOURNAL OF MANUFACTURING SYSTEMS, 2015, 36 : 87 - 94
  • [45] Functional integration approach for the berth allocation, quay crane assignment and specific quay crane assignment problems
    Karam, A.
    Eltawil, A. B.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 102 : 458 - 466
  • [46] The Berth and Quay Cranes Integrated Scheduling Based on Redundancy Policy
    Zhang Xiufu
    Sun Bin
    Sun Junqing
    Gou Zhijing
    2014 33RD CHINESE CONTROL CONFERENCE (CCC), 2014, : 7595 - 7600
  • [47] The Influence of the Quay Crane Traveling Time for the Quay Crane Scheduling Problem
    Yang, Kong-hung
    INTERNATIONAL MULTICONFERENCE OF ENGINEERS AND COMPUTER SCIENTIST, IMECS 2012, VOL II, 2012, : 1298 - 1301
  • [48] Multi-objective optimization of joint scheduling of berth and quay crane under green ports
    Yang, Xu
    SEVENTH INTERNATIONAL CONFERENCE ON TRAFFIC ENGINEERING AND TRANSPORTATION SYSTEM, ICTETS 2023, 2024, 13064
  • [49] The integrated berth allocation, quay crane assignment and scheduling problem: mathematical formulations and a case study
    Omar Abou Kasm
    Ali Diabat
    T. C. E. Cheng
    Annals of Operations Research, 2020, 291 : 435 - 461
  • [50] Integrated berth allocation and quay crane assignment and scheduling problem under the influence of various factors
    Yu, Meng
    Liu, Xuetao
    Ji, Xiaojing
    Ren, Yucong
    Guo, Wenjing
    IET COLLABORATIVE INTELLIGENT MANUFACTURING, 2024, 6 (04)