Coordinated Scheduling of Berth and Quay Crane Based on MAS

被引:0
|
作者
Zhao, Hui [1 ]
Cheng, Liqin [1 ]
机构
[1] Civil Aviat Univ China, Sch Econ & Management, Tianjin, Peoples R China
关键词
Berth; Quay; Collaborative; Agent;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
In order to improve the efficiency of a container terminal and shorten the turnaround time of ship in harbor, a coordinated scheduling strategy for berth and quay crane allocation based on MAS theory is put forward aiming at the relevance of berth and quay crane scheduling. Berth and quay crane are abstracted as distinct autonomy agent. The scheduling process is based on the interaction among multi agent. Simulation results show that the MAS scheduling strategy behaviors better than the central dispatching strategy.
引用
收藏
页码:328 / 331
页数:4
相关论文
共 50 条
  • [1] Quay crane scheduling for an indented berth
    Lee, Der-Horng
    Chen, Jiang Hang
    Cao, Jin Xin
    ENGINEERING OPTIMIZATION, 2011, 43 (09) : 985 - 998
  • [2] Heuristics for quay crane scheduling at indented berth
    Chen, Jiang Hang
    Lee, Der-Horng
    Cao, Jin Xin
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2011, 47 (06) : 1005 - 1020
  • [3] Research on Berth and Quay Crane Cooperative Scheduling Based on Uncertain Environment
    Yu, Meng
    Ma, Xiaoyun
    Tan, Tianjiao
    Chen, Song
    Wang, Qiang
    2018 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS (SMC), 2018, : 3565 - 3570
  • [4] Berth and quay crane allocation: a moldable task scheduling model
    Blazewicz, J.
    Cheng, T. C. E.
    Machowiak, M.
    Oguz, C.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2011, 62 (07) : 1189 - 1197
  • [5] Simultaneous Optimization of Berth Allocation, Quay Crane Assignment and Quay Crane Scheduling Problems in Container Terminals
    Aras, Necati
    Turkogullari, Yavuz
    Taskin, Z. Caner
    Altinel, Kuban
    OPERATIONS RESEARCH PROCEEDINGS 2012, 2014, : 101 - 107
  • [6] Robust Scheduling for Berth Allocation and Quay Crane Assignment Problem
    Rodriguez-Molins, M.
    Salido, M. A.
    Barber, F.
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2014, 2014
  • [7] A survey of berth allocation and quay crane scheduling problems in container terminals
    Bierwirth, Christian
    Meisel, Frank
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 202 (03) : 615 - 627
  • [8] Disruption recovery model for berth and quay crane scheduling in container terminals
    Zeng, Qingcheng
    Yang, Zhongzhen
    Hu, Xiangpei
    ENGINEERING OPTIMIZATION, 2011, 43 (09) : 967 - 983
  • [9] Dynamic berth and quay crane allocation for multiple berth positions and quay cranes
    Cahyono, R. T.
    Flonk, E. J.
    Jayawardhana, B.
    2015 EUROPEAN CONTROL CONFERENCE (ECC), 2015, : 3262 - 3267
  • [10] Berth and quay crane coordinated scheduling using multi-objective chaos cloud particle swarm optimization algorithm
    Ming-Wei Li
    Wei-Chiang Hong
    Jing Geng
    Jianlun Wang
    Neural Computing and Applications, 2017, 28 : 3163 - 3182