Random Fuzzy Optimization Model for Short-Term Hydropower Scheduling Considering Uncertainty of Power Load

被引:11
|
作者
Yuan, Liu [1 ]
Zhou, Jianzhong [1 ]
Mai, Zijun [1 ]
Li, Yuanzheng [1 ]
机构
[1] Huazhong Univ Sci & Technol, Sch Hydropower & Informat Engn, Wuhan 430074, Peoples R China
基金
国家重点研发计划; 中国国家自然科学基金; 国家自然科学基金重大研究计划;
关键词
Random fuzzy optimization; Short-termhydropower scheduling; Daily power load error; Cascade hydropower stations;
D O I
10.1007/s11269-017-1657-y
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper proposes a random fuzzy optimization (RFO) model for short-term hydropower scheduling, in order to avoid frequent unit switches owing to uncertainty of the power load. The cascade hydropower stations of Qing River in China are firstly introduced for research, and the power load error of the cascade is described. Defined as a random fuzzy variable, the error is analyzed and its distribution is derived to signify the uncertainty. Then random fuzzy programming is integrated into short-term hydropower scheduling to develop the RFO model, with more attention payed to unit spare capacity, while satisfying the demand of power grids. Meanwhile, an applicable solution searching strategy is proposed to solve the model. Simulation results of random fuzzy optimization of the cascade prove that the strategy is practical and the developed model is effective to avoid frequent unit switches. The method also can provide available references for other cascade dispatching center and hydropower stations with the same plight.
引用
收藏
页码:2713 / 2728
页数:16
相关论文
共 50 条
  • [31] Study of the scheduling rules of short-term power generation dispatching for single hydropower station
    Ji, Chang-ming
    Xie, Wei
    Yang, Zi-jun
    Zhang, Xiao-xing
    Zhu, Xin-liang
    2012 INTERNATIONAL CONFERENCE ON INDUSTRIAL CONTROL AND ELECTRONICS ENGINEERING (ICICEE), 2012, : 1412 - 1416
  • [32] Automatic fuzzy model identification for short-term load forecast
    Wu, HC
    Lu, CN
    IEE PROCEEDINGS-GENERATION TRANSMISSION AND DISTRIBUTION, 1999, 146 (05) : 477 - 482
  • [33] Short-Term Power Load Dynamic Scheduling Based on GWO-TCN-GRU Optimization Algorithm
    Hu, Yuyang
    Pan, Lianrong
    Yang, Xiao
    Wei, Xin
    Xie, Daiyu
    IEEE ACCESS, 2024, 12 : 144919 - 144931
  • [34] Short-term real-power scheduling considering fuzzy factors in an autonomous system using genetic algorithms
    Hong, Y. -Y.
    Li, C. -T.
    IEE PROCEEDINGS-GENERATION TRANSMISSION AND DISTRIBUTION, 2006, 153 (06) : 684 - 692
  • [35] Short-term load forecasting with fuzzy regression tree in power systems
    Mori, H
    Kosemura, N
    Ishiguro, K
    Kondo, T
    2001 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS, VOLS 1-5: E-SYSTEMS AND E-MAN FOR CYBERNETICS IN CYBERSPACE, 2002, : 1948 - 1953
  • [36] A Short-term Load Forecasting Based On Fuzzy Identification In Power System
    Liang Yu
    Wang Na
    Fan Li-ping
    2011 INTERNATIONAL CONFERENCE ON COMPUTERS, COMMUNICATIONS, CONTROL AND AUTOMATION (CCCA 2011), VOL III, 2010, : 197 - 199
  • [37] Accelerating Benders decomposition for short-term hydropower maintenance scheduling
    Rodriguez, Jesus A.
    Anjos, Miguel F.
    Cote, Pascal
    Desaulniers, Guy
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2021, 289 (01) : 240 - 253
  • [38] Modeling Start/Stop in Short-Term Multimarket Hydropower Scheduling
    Fodstad, Marte
    Helseth, Arild
    Henden, Arild Lote
    2016 13TH INTERNATIONAL CONFERENCE ON THE EUROPEAN ENERGY MARKET (EEM), 2016,
  • [39] Short-Term Load Forecasting Model Considering Multiple Time Scales
    Li, Dan
    Tang, Jian
    Zhen, Yawen
    Zhang, Ke
    PROCEEDINGS OF 2023 INTERNATIONAL CONFERENCE ON WIRELESS POWER TRANSFER, VOL 3, ICWPT 2023, 2024, 1160 : 625 - 632
  • [40] Simulation of short-term forecasts of wind and load for a stochastic scheduling model
    Barth, R.
    Meibom, P.
    Weber, C.
    2011 IEEE POWER AND ENERGY SOCIETY GENERAL MEETING, 2011,