The energy savings impact of the existing building commissioning process by building type

被引:3
|
作者
Ruffin, Alaina [1 ]
Claridge, David E. [1 ,2 ]
Baltazar, Juan-Carlos [1 ,3 ]
机构
[1] Texas A&M Engn Expt Stn, Energy Syst Lab, College Stn, TX 77840 USA
[2] Texas A&M Univ, Dept Mech Engn, College Stn, TX 77843 USA
[3] Texas A&M Univ, Dept Architecture, College Stn, TX USA
关键词
D O I
10.1080/23744731.2021.1921492
中图分类号
O414.1 [热力学];
学科分类号
摘要
This study presents the energy savings impact of the Continuous Commissioning (R) (CC(R)) version of the Existing Building Commissioning (EBCx) process in 197 projects (592 buildings) since the inception of the process in the early 1990s. These are the results of a comprehensive evaluation of the impact of EBCx projects. The evaluation of the impact of EBCx by building type included 316 education buildings, 141 health care facilities, 13 laboratory facilities, 32 office buildings, as well as 90 miscellaneous facilities. The annual energy cost savings, as of December 2016, exceeded $29.7 million (2017 $), for 197 EBCx projects (over 59 million ft(2) (5.48 million m(2)) of area). The median annual cost savings were $0.24/ft(2) ($2.26/m(2)) for individual education buildings, $0.40/ft(2) ($4.31/m(2)) for individual health care facilities, $1.54/ft(2) ($16.58/m(2)) for individual laboratory facilities, $0.59/ft(2) ($6.35/m(2)) for individual office buildings, $0.50/ft(2) ($5.38/m(2)) for individual miscellaneous facilities. The median percent savings for electricity were up to 14%, the demand savings up to 14%, the natural gas savings up to 33%, the CHW savings ranged from 21 to 36%, and the HW savings ranged from 28 to 71%. The median percent savings are remarkably consistent by building type.
引用
收藏
页码:1505 / 1521
页数:17
相关论文
共 50 条