The energy savings impact of the existing building commissioning process by building type

被引:3
|
作者
Ruffin, Alaina [1 ]
Claridge, David E. [1 ,2 ]
Baltazar, Juan-Carlos [1 ,3 ]
机构
[1] Texas A&M Engn Expt Stn, Energy Syst Lab, College Stn, TX 77840 USA
[2] Texas A&M Univ, Dept Mech Engn, College Stn, TX 77843 USA
[3] Texas A&M Univ, Dept Architecture, College Stn, TX USA
关键词
D O I
10.1080/23744731.2021.1921492
中图分类号
O414.1 [热力学];
学科分类号
摘要
This study presents the energy savings impact of the Continuous Commissioning (R) (CC(R)) version of the Existing Building Commissioning (EBCx) process in 197 projects (592 buildings) since the inception of the process in the early 1990s. These are the results of a comprehensive evaluation of the impact of EBCx projects. The evaluation of the impact of EBCx by building type included 316 education buildings, 141 health care facilities, 13 laboratory facilities, 32 office buildings, as well as 90 miscellaneous facilities. The annual energy cost savings, as of December 2016, exceeded $29.7 million (2017 $), for 197 EBCx projects (over 59 million ft(2) (5.48 million m(2)) of area). The median annual cost savings were $0.24/ft(2) ($2.26/m(2)) for individual education buildings, $0.40/ft(2) ($4.31/m(2)) for individual health care facilities, $1.54/ft(2) ($16.58/m(2)) for individual laboratory facilities, $0.59/ft(2) ($6.35/m(2)) for individual office buildings, $0.50/ft(2) ($5.38/m(2)) for individual miscellaneous facilities. The median percent savings for electricity were up to 14%, the demand savings up to 14%, the natural gas savings up to 33%, the CHW savings ranged from 21 to 36%, and the HW savings ranged from 28 to 71%. The median percent savings are remarkably consistent by building type.
引用
收藏
页码:1505 / 1521
页数:17
相关论文
共 50 条
  • [1] Existing building commissioning
    Poulos, Jim
    ASHRAE JOURNAL, 2007, 49 (09) : 66 - +
  • [2] Existing Building Commissioning
    Friedman, Glenn
    ASHRAE JOURNAL, 2010, 52 (12) : 10 - 10
  • [3] The Impact of Existing Building Commissioning on Electric Peak Demand
    Morsy, Ahmed
    Williams, Walter H., III
    Claridge, David E.
    ASHRAE TRANSACTIONS 2021, VOL 128, PT 1, 2022, 128 : 541 - 549
  • [4] Improvements to a Methodology for Estimating Potential Energy Savings from Existing Building-Commissioning/Retrofit Measures
    Liu, Jingjing
    Baltazar, Juan-Carlos
    Claridge, David E.
    ASHRAE: TRANSACTIONS 2011, VOL 117, PT 1, 2011, 117 : 868 - 883
  • [5] Long-term savings persistence from existing building commissioning and retrofits
    Ssembatya, Martin
    Fu, Hongxiang
    Claridge, David E.
    SCIENCE AND TECHNOLOGY FOR THE BUILT ENVIRONMENT, 2021, 27 (06) : 730 - 740
  • [6] Building commissioning, ensuring quality and savings
    Nicholson, M
    Molenaar, K
    CONSTRUCTION CONGRESS VI, PROCEEDING: BUILDING TOGETHER FOR A BETTER TOMORROW IN AN INCREASINGLY COMPLEX WORLD, 2000, : 1074 - 1082
  • [7] The Impact of Existing Building Commissioning Measures on Peak Electric Demand
    Morsy, Ahmed
    Williams, Walter
    Claridge, David E.
    ASHRAE TRANSACTIONS 2022, VOL 128, PT 2, 2022, 128 : 492 - 501
  • [8] Existing Building Commissioning at a Community College
    Madden, Luke A.
    Yagua, Carlos
    Schroeder, Fred L.
    Baltazar, Juan-Carlos
    Claridge, David E.
    Williams, Walter H.
    Hoelke, David
    ASHRAE TRANSACTIONS 2020, VOL 126, PT 1, 2020, 126 : 883 - 894
  • [9] Saving energy with building commissioning
    Roth, KW
    Westphalen, D
    Brodrick, J
    ASHRAE JOURNAL, 2003, 45 (11) : 65 - 66
  • [10] Monitoring-based HVAC commissioning of an existing office building for energy efficiency
    Wang, Liping
    Greenberg, Steve
    Fiegel, John
    Rubalcava, Alma
    Earni, Shankar
    Pang, Xiufeng
    Yin, Rongxin
    Woodworth, Spencer
    Hernandez-Maldonado, Jorge
    Applied Energy, 2013, 102 : 1382 - 1390