Robust Linear Parameter-Varying Control for Multi-Megawatt Wind Turbine Testing

被引:0
|
作者
Basler, Maximilian [1 ]
Hruschka, Felix [1 ]
Abel, Dirk [1 ]
机构
[1] Rhein Westfal TH Aachen, Inst Automat Control, Aachen, Germany
关键词
D O I
10.1109/CDC45484.2021.9682885
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Wind turbine testing is of great relevance for the wind industry to reduce the levelized cost of energy. For this purpose, hardware-in-the-loop simulators have been developed within the last years and the concept has been validated using multi-megawatt state-of-the-art nacelles. From the experimental experience of several years, different physical phenomena have been identified, which are insufficiently and unsystematically handled by state-of-the-art control algorithms. These effects include multi-physical couplings, nonlinear friction, and periodic disturbances due to unbalanced masses. We analyze the test bench control problem by means of linear parameter-varying (LPV) control theory and arrive at a formulation with the scheduling parameters rotation speed and torque. Based on experimental data, we derive a quasi-LPV plant model for which controller synthesis is conducted. In particular, the superior performance of different self-scheduled dynamic output feedback LPV controllers compared to a standard robust controller is shown. By using parameter-dependent Lyapunov functions, we guarantee both stability and performance with respect to scheduling parameters with a bounded rate of variation. Furthermore, we propose an approach for systematically handling highly dynamic fault cases on a test bench by reconfiguring controller properties through the introduction of fault specific dynamic weighting functions. A converter failure test case is analyzed in simulation to show the benefits of the here proposed controller design.
引用
收藏
页码:2038 / 2045
页数:8
相关论文
共 50 条
  • [21] Methodology for Emergency Shut-Down of Multi-Megawatt Wind Turbine Generators
    Gros, Sebastien
    Chachuat, Benoit
    11TH INTERNATIONAL SYMPOSIUM ON PROCESS SYSTEMS ENGINEERING, PTS A AND B, 2012, 31 : 1251 - 1255
  • [22] On-line vibration monitoring and diagnosing of a multi-megawatt wind turbine gearbox
    Zhu, C.
    Huang, H.
    Liu, H.
    Song, C.
    Ma, F.
    Liu, Z.
    INTERNATIONAL GEAR CONFERENCE 2014, 2014, : 1089 - +
  • [23] The influence of flexibility within multibody modeling of multi-megawatt wind turbine gearboxes
    Helsen, J.
    Heirman, G.
    Vandepitte, D.
    Desmet, W.
    PROCEEDINGS OF ISMA 2008: INTERNATIONAL CONFERENCE ON NOISE AND VIBRATION ENGINEERING, VOLS. 1-8, 2008, : 2045 - 2071
  • [24] Comparison of multi-megawatt LVRT testing setups for the certification of wind turbines
    Bielemeier, Jonas
    Frehn, Anica
    Monti, Antonello
    Fruehmann, Richard
    Santjer, Fritz
    2019 IEEE MILAN POWERTECH, 2019,
  • [25] The impact of the aerodynamic model fidelity on the aeroelastic response of a multi-megawatt wind turbine
    Sayed, M.
    Klein, L.
    Lutz, Th.
    Kraemer, E.
    RENEWABLE ENERGY, 2019, 140 : 304 - 318
  • [26] 3D CFD quantification of the performance of a multi-megawatt wind turbine
    Laursen, J.
    Enevoldsen, P.
    Hjort, S.
    SCIENCE OF MAKING TORQUE FROM WIND, 2007, 75
  • [27] Parameter-varying modelling and fault reconstruction for wind turbine systems
    Shao, Hui
    Gao, Zhiwei
    Liu, Xiaoxu
    Busawon, Krishna
    RENEWABLE ENERGY, 2018, 116 : 145 - 152
  • [28] A Sliding Mode Pitch Control for Multi-Megawatt Offshore Wind Turbines
    Larrea-Leon, Carlos
    Seshagiri, Sridhar
    2018 CLEMSON UNIVERSITY POWER SYSTEMS CONFERENCE (PSC), 2018,
  • [29] Robust linear parameter-varying control of blood pressure using vasoactive drugs
    Luspay, Tamas
    Grigoriadis, Karolos
    INTERNATIONAL JOURNAL OF CONTROL, 2015, 88 (10) : 2013 - 2029
  • [30] α-robust H∞ state feedback control for a class of linear parameter-varying systems
    Zhou, WN
    Su, HY
    Chu, J
    2004 8TH INTERNATIONAL CONFERENCE ON CONTROL, AUTOMATION, ROBOTICS AND VISION, VOLS 1-3, 2004, : 1751 - 1756