Decision Tree and AHP Methods Application for Projects Assessment: A Case Study

被引:26
|
作者
Maceika, Augustinas [1 ]
Bugajev, Andrej [2 ]
Sostak, Olga Regina [2 ]
Vilutiene, Tatjana [3 ]
机构
[1] Vilnius Gediminas Tech Univ, Fac Mech, Sauletekio Ave 11, LT-10223 Vilnius, Lithuania
[2] Vilnius Gediminas Tech Univ, Fac Fundamental Sci, Sauletekio Ave 11, LT-10223 Vilnius, Lithuania
[3] Vilnius Gediminas Tech Univ, Fac Civil Engn, Sauletekio Ave 11, LT-10223 Vilnius, Lithuania
关键词
project assessment; sustainability criteria; decision tree; analytic hierarchy process; construction projects; sensitivity analysis; decision robustness; CONSTRUCTION PROJECTS; MULTICRITERIA ANALYSIS; RISK-MANAGEMENT; SUSTAINABILITY; MODEL; PERFORMANCE; SELECTION; SYSTEM; STAKEHOLDERS; INDICATORS;
D O I
10.3390/su13105502
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
This research is dedicated to the modelling of decision process occurring during the implementation of construction projects. Recent studies generally do not assess the robustness of the decisions regarding the possible changes during the construction project implementation. However, such an assessment might increase the reliability of the decision-making process. We addressed this gap through a new model that combines the decision-making process modelling with the AHP method and includes the analysis of model stability concerning stakeholders' behaviour. We used the Analytic Hierarchy Process (AHP) and Decision tree methods to model the decision-making process. The proposed model was validated on a case study of multiple construction projects. The assessment was performed from individual investor's and independent expert's perspectives. The criteria for the assessment were selected according to the principles of sustainability. We performed the sensitivity analysis, making it possible to assess the possible changes of the decisions depending on the potential patterns of the decision-makers' behaviour. The results of the study show that, sometimes, small fluctuations in the project factors affect the project selection indicating the possible lack of the robustness of the project decisions.
引用
收藏
页数:33
相关论文
共 50 条
  • [31] METHODS OF RISK ASSESSMENT AND DECISION-MAKING IN INVESTMENT PROJECTS AMID ECONOMIC INSTABILITY
    Kiseleva, Irina
    Gasparian, Mikhail
    Karmanov, Mikhail
    Kuznetsov, Vladimir
    REVISTA GESTAO & TECNOLOGIA-JOURNAL OF MANAGEMENT AND TECHNOLOGY, 2023, 23 (01): : 57 - 68
  • [32] Assessment of forest restoration projects in different regions using multicriteria decision analysis methods
    Zhang, Tingting
    Lan, Jing
    Yu, Jinna
    Liu, Zhen
    Yao, Shunbo
    JOURNAL OF FOREST RESEARCH, 2020, 25 (01) : 12 - 20
  • [33] Environmental impact assessment based on group decision-making methods in mining projects
    Rikhtegar, Navid
    Mansouri, Nabiollah
    Oroumieh, Amir Ahadi
    Yazdani-Chamzini, Abdolreza
    Zavadskas, Edmundas Kazimieras
    Kildiene, Simona
    ECONOMIC RESEARCH-EKONOMSKA ISTRAZIVANJA, 2014, 27 (01): : 378 - 392
  • [34] Application of AHP on multiple criteria decision making
    Xiong, Rui
    Jiang, Xiaoya
    Nanjing Hangkong Hangtian Daxue Xuebao/Journal of Nanjing University of Aeronautics & Astronautics, 1994, 26 (02):
  • [35] A METHOD FOR LANDSLIDE SUSCEPTIBILITY ASSESSMENT INTEGRATING ROUGH SET AND DECISION TREE: A CASE STUDY IN BEICHUAN, CHINA
    Wen, Zhi
    He, Binbin
    Xu, Dasong
    Feng, Qian
    2016 IEEE INTERNATIONAL GEOSCIENCE AND REMOTE SENSING SYMPOSIUM (IGARSS), 2016, : 4952 - 4955
  • [36] Application and study of ordinal decision tree in the teaching quality evaluation
    Ma, Hong-Yan
    Chen, Jian-Kai
    Yang, Nan
    Wang, Li-Ling
    Journal of Applied Sciences, 2013, 13 (19) : 3903 - 3908
  • [37] Integration of AHP and GTMA to Make a Reliable Decision in Complex Decision-Making Problems: Application of the Logistics Provider Selection Problem as a Case Study
    Tuljak-Suban, Danijela
    Bajec, Patricija
    SYMMETRY-BASEL, 2020, 12 (05):
  • [38] Study on Support Vector Machine Based Decision Tree and Application
    Dong, G. M.
    Chen, J.
    FIFTH INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS AND KNOWLEDGE DISCOVERY, VOL 5, PROCEEDINGS, 2008, : 318 - 322
  • [39] Risk Assessment in Bridge Construction Projects Using Fault Tree and Event Tree Analysis Methods Based on Fuzzy Logic
    Abdollahzadeh, Gholamreza
    Rastgoo, Sima
    ASCE-ASME JOURNAL OF RISK AND UNCERTAINTY IN ENGINEERING SYSTEMS PART B-MECHANICAL ENGINEERING, 2015, 1 (03):
  • [40] The Modelling of Roof Installation Projects Using Decision Trees and the AHP Method
    Maceika, Augustinas
    Bugajev, Andrej
    Sostak, Olga R.
    SUSTAINABILITY, 2020, 12 (01)