The need for pile testing

被引:0
|
作者
Tchepak, S [1 ]
机构
[1] Franki Pacific Holdings, Sydney, NSW, Australia
来源
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Market pressures have resulted in keen competition amongst piling contractors. Together with increased loadings from taller and more complex structures, these market pressures have been a contributory factor to increased loadings on piles. The piling market also demands that time for completion of works be reduced to the absolute minimum. Consequently, the combination of higher loadings and the necessity to complete works to strict time constraints should demand a more comprehensive testing regime to ensure quality. Higher loadings are usually resisted by larger diameter bored piles. Until recently, higher loads could not be tested economically using conventions static testing methods. The introduction of Statnamic and Osterberg-cell testing has changed this. However, the author believes that testing in Australia and also in most Western countries, has not been increased to cater for the newer, more demanding industry needs. Construction methods for bored and auger piles have often been shown to suffer potentially serious deficiencies if quality control measures are not satisfactory. Examples of problems are presented fox CFA piles and bored piles, with the latter also addressing problems observed with the use of bentonite drilling fluids. The need for testing is discussed, with particular emphasis being placed on problems that occur during pile construction. It is concluded that the pile testing regime on a project should be increased to ensure that quality of construction is commensurate with design expectations, and also to enhance understanding of pile behaviour and pile design.
引用
收藏
页码:243 / 252
页数:10
相关论文
共 50 条
  • [21] Pile integrity testing and drivability analysis
    Özüdogru, Tolga Y.
    Senol, Aykut
    Taylan, Z. Nil
    Teknik Dergi/Technical Journal of Turkish Chamber of Civil Engineers, 2009, 20 (03): : 4793 - 4810
  • [22] The pile testing in Fuzhou International Airport
    Liu, XA
    DEEP FOUNDATIONS ON BORED AND AUGER PILES - BAP III, 1998, : 281 - 284
  • [23] Pile Integrity Testing and Drivability Analysis
    Ozudogru, Tolga Y.
    Senol, Aykut
    Taylan, Z. Nil
    TEKNIK DERGI, 2009, 20 (03): : 4793 - 4810
  • [24] Analysing method for pile quality testing
    Chen, Rugui
    He, Jishan
    Zhongnan Gongye Daxue Xuebao/Journal of Central South University of Technology, 28 (04): : 311 - 314
  • [25] A Case Study Pile Load Testing (PLT) to Evaluate Driven Pile Behaviors
    Hossein Alimohammadi
    Jamal N. Tahat
    Indian Geotechnical Journal, 2022, 52 : 959 - 968
  • [26] A Case Study Pile Load Testing (PLT) to Evaluate Driven Pile Behaviors
    Alimohammadi, Hossein
    Tahat, Jamal N.
    INDIAN GEOTECHNICAL JOURNAL, 2022, 52 (04) : 959 - 968
  • [27] SMALL STRAIN SONIC PILE TESTS - THE NEED FOR CAUTION
    WONG, KY
    GROUND ENGINEERING, 1995, 28 (09): : 32 - 37
  • [28] THE NEED FOR DIAGNOSTIC TESTING
    Olander, Herbert T.
    ELEMENTARY SCHOOL JOURNAL, 1933, 33 (10): : 736 - 745
  • [29] TESTING NEED FOR ERUCTATION
    PENCHINA, CM
    PENCHINA, MS
    PEDIATRICS, 1971, 47 (06) : 1089 - &
  • [30] THE NEED OF PREVENTIVE TESTING
    Brueckner, Leo J.
    JOURNAL OF EDUCATIONAL RESEARCH, 1939, 32 (06): : 456 - 457