Central artery/tunnel project: A precast bonanza

被引:0
|
作者
Chandra, V
Ricci, AL
机构
[1] Parsons Brinckerhoff Quade & Douglas Inc, New York, NY USA
[2] Massachusetts Turnpike Author, Cent Artery Tunnel Project, Boston, MA USA
来源
PCI JOURNAL | 2000年 / 45卷 / 03期
关键词
Environmental quality - Highway construction;
D O I
10.15554/pcij.05012000.14.20
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This article provides an overview of the monumental efforts of Massachusetts transportation officials, their engineering consultants, and multitudes of construction industry professionals to ease congestion, improve motorist safety and address issues of environmental quality in the heart of Boston, Massachusetts. The Central Artery/Tunnel Project is the largest highway construction job ever undertaken in the United States, involving many diverse types of precast concrete construction.
引用
收藏
页码:14 / 20
页数:7
相关论文
共 50 条
  • [1] Central Artery/Tunnel Project: Standardized precast, prestressed transition structures
    Hill, J
    Hsu, RC
    Chandra, V
    PCI JOURNAL, 2001, 46 (01): : 22 - 27
  • [2] Central artery/tunnel project: Innovative use of precast segmental technology
    Towell, PJ
    Mainville, PA
    Chandra, V
    Homsi, E
    PCI JOURNAL, 2000, 45 (04): : 44 - +
  • [3] Central artery/tunnel project: Precast/prestressed structures span the big dig
    Donington, K
    Towell, P
    Chandra, V
    PCI JOURNAL, 2000, 45 (05): : 30 - +
  • [4] Underground engineering for the central artery/tunnel project
    Parsons Brickerhoff Quade &, Douglas, Inc
    Civ Eng Pract, 1 (7-10):
  • [5] The central artery/tunnel project preservation program
    Beth Anne Bower
    Historical Archaeology, 1998, 32 : 11 - 18
  • [6] Partnering & its implementation on the Central Artery/Tunnel Project
    Gilleland Daigle, Michelle
    Touran, Ali
    Civil Engineering Practice, 13 (01): : 49 - 62
  • [7] Central artery/tunnel project: Standard temporary bridges
    Donington, K
    Wisniewski, T
    Chandra, V
    PCI JOURNAL, 2000, 45 (06): : 44 - 49
  • [8] Pumping test programs for Central Artery/Tunnel Project
    Lahlaf, AM
    Burke, DM
    Ahmed, I
    Leathers, FD
    SPECIAL GEOTECHNICAL TESTING: CENTRAL ARTERY/TUNNEL PROJECT IN BOSTON, MASSACHUSETTS, 1999, (91): : 116 - 139
  • [9] Environmental challenges facing the Central Artery/Tunnel Project
    Ionata, EW
    NORTH AMERICAN TUNNELING '98, 1998, : 199 - 203
  • [10] Dewatering effects on structures adjacent to central artery/tunnel project
    Papadopoulos, A
    Dusseault, S
    Bobrow, D
    GEOTECHNICAL ENGINEERING FOR TRANSPORTATION PROJECTS, VOL 2, 2004, (126): : 1524 - 1533